Log in
Forum
Topic

AIA Re-occupancy Assessment Tool- Health Canada equivalent?

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by Shakir Ismail on Oct 6, 2020, 2:02 pm

We're working on an office building in Ontario pursuing LEED ID+C and I hoped to present this Pilot credit to our client as a reasonable COVID-19 safety strategy. Since my client is federal govt...

Bathroom and deposit cooling

Healthcare-v2009 EAp2: Minimum Energy Performance
posted by Davide Liviero on Oct 7, 2020, 4:00 am

Hello everyone,

I am simulating a 6-floor, 50 000-square-meter hospital and I am struggling to understand how to behave with some zones. As far as I understood bathrooms and deposits are...

MR-prerequites and criterias

EBOM-v4 MRp1: Ongoing purchasing and waste policy
posted by Alice Andersen on Oct 7, 2020, 6:31 am

I am doing a certication of an office building.

In this connection I would like to know which prerequisites and criterias that includes purchasing food in the calculations? I think it is a...

Shared energy metering with USGBC

EBOM-v4 EAp3: Building-level energy metering
posted by Alice Andersen on Oct 7, 2020, 7:40 am

In connection with EAp3 it is required to share the metered energy use of the building with US-GBC during the first 5 years.

In this connection I would like to know, if the energy ...

Historical data based

EBOM-v4 EAp3: Building-level energy metering
posted by Alice Andersen on Oct 8, 2020, 4:27 am

I am able to provide the energy use on a yearly basis of all buildings in Denmark. It is a great statisical investigation, since it is for all buildings buit later than year 2012 and the size is...

VOC budget method shortcut for project with one (1) non-compliant product.

NC-v4 EQc2: Low-emitting materials
posted by Jeff Wiedmeyer on Oct 8, 2020, 4:28 pm

Is there a...

Recommended, Photo-ionization detectors (PIDs)

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Summer Gorder on Oct 10, 2020, 9:33 pm

Please let me know the best equipement you recommend for these tests. Currently, we are looking at the GrayWolf...

Measuring Devices WELL v2

WELL v1 Building Standard Tip Sheet
posted by Przemysław Rejczak on Oct 14, 2020, 10:35 am

Dear Everyone

I am trying to collect  all necessary devices to prepare performance testing. Can you recommend what device type do you use? Do you usually rent it or buy?  For now I have...

Change of rating system during certification progress

LEED Rating System Selection
posted by louise renesme on Oct 16, 2020, 10:38 am

Is it possible to change our rating system even if our design review has already been submitted and we got the feedback ?

Our project is currently under the LEED NC 2009 BD+C...

Manufacturing Equipment

EBOM-2009 MRc2: Sustainable Purchasing—Durable Goods
posted by Jessica Kruse on Oct 19, 2020, 10:31 am

I have a manufacturing facility looking to earn the Electric - Powered equipment credit.  We are counting monitors, printers, etc that are listed as required.  What about production equipment? Do...