Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EAc2.1 work

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Elizabeth Crenshaw Hammitt   on 

From reading these comments, it seems like any work done EAc2.1 MAY NOT count toward this credit.

5
Fri Feb 8, 2013, 10:35 pm

Green energy default values

CI-2009 EAc4:Green Power
posted by  Adam Targowski  on 

In our project we are not making an energy simulation so in this credit we are forced to use option 2. I have two concerns: 1.

3
Fri Feb 8, 2013, 7:04 pm

What do I do with a roof tha is superimposed by an helipad?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Marina Andrade  on 

In a discussion here in the LEED user, i read about roof's that are covered with usable spaces, and one of these areas cited, was the helipads, i'd like to know if even a helipad has to be subtract

7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 8, 2013, 5:25 pm

Should I consider process water?

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Nadia Ayala  on 

Hi, My project is a pharmaceutical facility. For their industrial process, they use a fairly large amount of water. I was wondering if process water is considered for this credit.

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Thu Feb 7, 2013, 10:42 pm
8
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Feb 7, 2013, 8:31 pm

Include curbs and tops of walls? SRI of granite curb?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erica Downs  on 

In adding up the "paved" areas, are granite curbs (between the sidewalk and street) typically included?

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 7, 2013, 7:05 pm

Thermostat Values

CS-2009 EAp2:Minimum Energy Performance
posted by  Herman C  on 

Hello, How are the Thermostat values (Upper and Lower limit) to be selected for LEED CS please?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 7, 2013, 5:40 pm

Hotel and Convention Center - Registration as One project

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ahmad Gabir  on 

We have a hotel building (600,000 sf) and a convention center (150,000 sf) which are connected by a 300-400 feet ong corridor.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 7, 2013, 4:34 pm

NC Comercial Building into a LEED ND Neighborhood (Stage 1)

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Gaston Viau  on 

Our project is located into a LEED Neighborhood Development which obtained Stage 1 certification.

3
Thu Feb 7, 2013, 3:52 pm

LEED Canada SS Credit 6.1 - Stormwater - Cistern Sizing

LEED Canada Forum
posted by  Meghan MacSween  on 

Hi, The 2009 version of LEED included an interpretation for the SS6.1 credit stating that controling site discharge using storage such as cisterns could meet the credit requirements even if the en

2
Default Avatar
Mechanical Engineer
Stantec
LEEDuser Premium Member
18 thumbs up
Thu Feb 7, 2013, 1:12 pm