Forum quick links
Non-certifiable building within LEED campus boundary
posted by Marcio Alberto Casado Pereira on
We have a campus composed of 5 buildings where one of them (P40) does not meet MPR 4: minimum floor area requirement of 1000sqft.
Can we earn this though new building
CI-2009 MRc2:Construction Waste Managementposted by Mathilda Jonsson on
Hi all! I'm working on a project which seeks LEED CS for the base building and LEED CI for a companys spaces.
New RP threshold for EAp1?
EBOM-2009 RPc1:Regional Priorityposted by Donna Juselis on
We are currently working on a project in NC (zip 27244). The regional priority threshold for EAp1 Option 1 is supposed to be 28% (new bldgs) and 24% (existing bldgs).
What is an intersection?
ND-v2009 SLLc1:Preferred locationsposted by Timothy Nabholz on
I am currently using a radii around one of our potential sites and am trying to calculate how many intersections are within that radius.
LEED for Homes or NC
posted by Courtney Royal on
Can a single family 7-floor home in Manhattan go for LEED-NC?
Electricity Consumption - Option D
NC-2009 EAc5:Measurement and Verificationposted by Yu Wang on
I'm working on an option D M&V plan according to LEED.
LEED HC WEc4.2 vs Pilot Credit 17
Pilot-Credits WEpc17:Cooling tower water useposted by April Eisenhauer on
A long-term healthcare project I have been working on that was registered under LEEDv2.2 recently got resistance for submitting LEED HC WEc4.2 as an ID credit.
Building with half renovation
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jatuwat Varodompun on
We purchased an abandon building which will be renovated for both envelope, Electric, and HVAC. The problem is we will own only have of the building.