Forum quick links
Residential Building
posted by K A on
Hello, A residential apartment building four stories high, all rented apartments to tenants and in construction since last year and due for occupancy this summer.
Problems with tracking spreadsheet
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Chris Miller on
I'm having problems with the Tracking Sheet in the Documentation Toolkit. The drop-down menus are empty.
too much light?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by kate dixon on
I calculated the floor area in rooms that had less than .15 that would contribute. however, many spaces have over .18 (too much light).
Basecase system selection for Hotel Building in a mixed use dev
CS-2009 EAc1:Optimize Energy Performanceposted by Kevin Sullivan on
We have a high rise mixed use development in Bangalore, India for which we are following Appendix G methodology for LEED Energy compliance.
Active control modulating the HVAC system as per space demand
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Lavanya Veerappa on
Does that mean a dedicated VAV box hooked with any one of the following meets the requirement: 1. Thermostat control 2. Occupancy sensor 3.
Reclaimed land from Sea
NC-2009 SSc1:Site Selectionposted by BOHYUN CHUNG on
Dear all, I'm doing LEED NC project and the building site is the reclaimed land from the sea. Of course, the owner just bought that site from another developer.
Reclaimed Land eligible for SSc5.1?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Elke Malleier on
My LEED project is located on reclaimed land (connecting/filling 2 islands to 1 bigger island) with no previous development - I am wondering if I can pursue this credit according to the Greenfield
Health care - Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I'm working on a specific project which consists of a health/diagnostic centre which uses machines such as X-rays, magnetic resonance and other medical equipment which were modeled as process
cooking surface in apartment within 25 feet of the facade?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Courtney Royal on
Hello! While using ASHRAE 62.1-2007, we are having a hard time trying to understand the provision that the cooking surface in an apartment needs to be within 25 feet of the façade with operable op
HVAC System selection
NC-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Hi does anybody have any feedback on how different systems perform in term of the energy credits for LEED NC.