Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Residential Building

LEED Rating System Selection
posted by  K A  on 

Hello, A residential apartment building four stories high, all rented apartments to tenants and in construction since last year and due for occupancy this summer.

6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 19, 2013, 5:48 pm

Problems with tracking spreadsheet

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Chris Miller  on 

I'm having problems with the Tracking Sheet in the Documentation Toolkit. The drop-down menus are empty.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 18, 2013, 6:56 pm

too much light?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  kate dixon  on 

I calculated the floor area in rooms that had less than .15 that would contribute. however, many spaces have over .18 (too much light).

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Feb 18, 2013, 5:18 pm

Basecase system selection for Hotel Building in a mixed use dev

CS-2009 EAc1:Optimize Energy Performance
posted by  Kevin Sullivan  on 

We have a high rise mixed use development in Bangalore, India for which we are following Appendix G methodology for LEED Energy compliance.

3
Default Avatar
Energy Analyst
The Wall Consulting Group
LEEDuser Basic Member
1 thumbs up
Mon Feb 18, 2013, 4:02 pm

Active control modulating the HVAC system as per space demand

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Lavanya Veerappa  on 

Does that mean a dedicated VAV box hooked with any one of the following meets the requirement: 1. Thermostat control 2. Occupancy sensor 3.

3
Ms
LEAD Consultancy & Engineering services
LEEDuser Basic Member
5 thumbs up
Mon Feb 18, 2013, 2:42 pm

Reclaimed land from Sea

NC-2009 SSc1:Site Selection
posted by  BOHYUN CHUNG  on 

Dear all, I'm doing LEED NC project and the building site is the reclaimed land from the sea. Of course, the owner just bought that site from another developer.

4
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Sun Feb 17, 2013, 10:26 am

Reclaimed Land eligible for SSc5.1?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Elke Malleier  on 

My LEED project is located on reclaimed land (connecting/filling 2 islands to 1 bigger island) with no previous development - I am wondering if I can pursue this credit according to the Greenfield

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Feb 17, 2013, 9:19 am

Health care - Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I'm working on a specific project which consists of a health/diagnostic centre which uses machines such as X-rays, magnetic resonance and other medical equipment which were modeled as process

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Feb 16, 2013, 8:21 pm

cooking surface in apartment within 25 feet of the facade?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Courtney Royal  on 

Hello! While using ASHRAE 62.1-2007, we are having a hard time trying to understand the provision that the cooking surface in an apartment needs to be within 25 feet of the façade with operable op

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Fri Feb 15, 2013, 11:22 pm

HVAC System selection

NC-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

Hi does anybody have any feedback on how different systems perform in term of the energy credits for LEED NC.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 15, 2013, 7:08 pm