Forum quick links
Mock up Room Waste Management
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
Hi All, Our site is starting off with a mock up guest room villa as a test bed before we construct the balance of 90 odd guest villas.
MPR for adjacent buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
LEED project boundary lines that “slice” through party walls must not pass through any MEP service infrastructure.
EAP2 Mandatory Requirement
NC-2009 EAc1:Optimize Energy Performanceposted by OSCAR DE LA RED on
Can an almost construted building be certified under LEED C&S, if the envelope building is not able to comply with EAP2,EAc1 ASHRAE 90.1.2007 mandatory requirement (OPTION 2 and 3 are not av
Creating own IDC Form?
CI-2009 MRc4:Recycled Contentposted by Sean Falvey on
We are having lots of issues using the IDC Form that LEED provides, i.e., form not saving, formulas not working.
This is a serious question- How are you documenting furniture?
CI-2009 MRc5:Regional Materialsposted by Valerie Molinski on
I am working on several CI projects right now, and I am having HUGE issues with documenting the furniture for this credit.
ASHRAE 09.1-2007 Requirements for Baseline Wall Density
CS-2009 EAc1:Optimize Energy Performanceposted by Wes Lawson on
Hi all, I am performing energy simulations for my baseline and proposed buildings for EAc1 (and EAp2). Can anyone help me out with the baseline wall density (lb/ft^3) that I should be using?
Part of HVAC considered as Process for clean rooms?
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, My project includes extraordinary energy consumption for HVAC resulting from maintaining clean room environments – specifically the amount of air changes and pressure requirements
When do we start submitting information to achieve MRc2 credits
NC-2009 MRc2:Construction Waste Managementposted by Dulian Terry-Swaby on
Hi, We are currently in phase #2 of demolition of a hotel that we plan to convert to a 4 star resort. My question is: When should we start submitting information to meet this credit?
implementation costs (soft costs)
Pilot-Credits EQpc24:Acousticsposted by Emmanuel Pauwels on
We are considering this credit for a New Construction Project. Before making a decision we need to estimate the engineering cost involved for this credit.
Discrepancy between LEED form and scorecard on LEED Online
posted by Phil Meyer on
We are documenting 4 points for WEc1 Water Efficient Landscaping in the completed LEED online form (compliance button in form even notes 4 pts) for a LEED 2009 NC project.