Forum quick links
MRc4 - Material Ingredients (Disclosure & Optimization)
posted by Tom Lent on
There is some very good in this credit, plus some bad that could completely moot the value of the good. On the good side, the intent is excellent.
Modeling Context
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Marzia Sedino on
Hi, For credit compliance, under OPTION 1 - Simulation, is it required to model the building context (e.g. neighboring buildings/obstructions)?
Regular Occupied Spaces
NC-2009 PIf3:Occupant and Usage Dataposted by Tanja Arnesson on
Hi, I'm working on a LEED NC project in Sweden where we are building a large building that contains a large concert and congress hall as well as a hotel.
Shade from future tree canopy within 5 years
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Michael Esposito on
Under SSc7.1 one strategy is to shade hardscape with trees. Is there a template or guideline that shows the average tree canopy diameter within 5 years for certain species?
About MPR#6 in PIf1
NC-2009 PIf1:Minimum Program Requirementsposted by Ron Dean on
Hello, I have a question about filling PIf1 out in leedonline, this is about complying with all the MPRs. Our building will use energy and water meters to report our data to USGBC.
IEQ Space Matrix
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Kim Shinn on
We are working on a NC 2009 project, a new community hospital, and we have just gotten a clarification question from the GBCI review team.
Excluded Spaces
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Greengrade User on
What if any spaces should be excluded from this credit?
Definitions
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Mike D on
The table lists 3 components: - Prior condition area - Completed design area - Retained components area I understand the prior condition area which is the existing components before any works.
Gas Rooftop HVAC
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Kasandra Martin on
Are there any guidelines with LEED CI for having gas fired rooftop hvac units?