Topic | Recent |
---|---|
Existing and New ConstructionNC-2009 EAp2: Minimum Energy Performanceposted by Haojie Wang on Jul 31, 2015, 8:55 am
We have a building that contains both existing and new construction. I wonder how we should determine the LEED points we will achieve given certain percentage savings. Is it based on 60% rule?... Last reply: Haojie Wang, Jul 31, 2015, 11:55 am |
|
LEED-NC or LEED for Homes (and v3 vs v4)?LEED Rating System Selectionposted by emily reese moody on Aug 27, 2015, 7:50 pm
Hello, I've tried calling USGBC, who told me to email certinfo@usgbc.org. I did that a little over 2 weeks ago, and have yet to get a response. I'... Last reply: Asa Foss, Aug 31, 2015, 9:39 am |
|
CO2 sensorsNC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Emmanuel Pauwels on Sep 22, 2015, 6:55 am
We are working on an office project. The typical floor will be a completely open space, with workstations and meeting spaces (not enclosed). This will not be a densely occupied space. Last reply: Emmanuel Pauwels, Sep 23, 2015, 10:46 am |
|
Modeling Evaporative cooling systems (ambiator)NC-2009 EAp2: Minimum Energy Performanceposted by Visu Boj on Sep 29, 2015, 3:26 am
Hi all, Last reply: Marcus Sheffer, Dec 22, 2019, 5:24 pm |
|
LEED 2009 Energy UpdatesNC-2009 EAc1: Optimize Energy Performanceposted by Theresa Lehman on Sep 30, 2015, 5:23 pm
Did anyone see the that USGBC has launched a set of proposals to increase the energy minimums for LEED v2009, which is open for project registration until October 31, 2016. Please visit:... Last reply: Scott Bowman, Oct 19, 2015, 3:35 pm |
|
90.1 Mandatory ProvisionsNC-2009 EAp2: Minimum Energy Performanceposted by Charles Daze on Oct 20, 2015, 12:47 pm
Does Appendix G or LEED modeling protocol require the baseline building be modeled with all of the mandatory provisions of Section 6.4? And if so where is this stated? Appendix G implies... Last reply: Gustavo De las Heras Izquierdo, Feb 19, 2020, 3:41 pm |
|
Baseline modeling for manufacturing facilityNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Oct 26, 2015, 2:04 am
Hi Markus and colleagues, Last reply: Vassil Vassilev, Oct 27, 2015, 2:04 am |
|
Base Model using Option DNC-2009 EAc5: Measurement and Verificationposted by Kalyan Nishtala on Nov 2, 2015, 1:26 pm
This is the first time I am dealing with this credit. I am confused with what the base mode (using option D) entails. Is it simply an Appendix G model calibrated in the same way the as built... Last reply: Marcus Sheffer, Nov 3, 2015, 9:12 am |
|
Interchangeability of LE/FE vehicles and HOV parking spacesNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Karl Heitman on Nov 18, 2015, 4:07 pm
We are pursuing both SS4.3 and SS4.4. As long as we provide the total parking spaces required for both 4.3 AND 4.4, can those spaces be used interchangeably for either LE/FE and HOV? Can the... Last reply: Michelle Bombeck, Jan 30, 2017, 12:12 pm |
|
Central PV system distribution to one LEED target buildingNC-2009 EAc2: On-Site Renewable Energyposted by Hongyun Zhou on Nov 20, 2015, 3:15 am
I am working on a single building LEED project in an industry park, which has a central PV system inside. The PV power capacity has been identified and it will connect to several buildings, my... Last reply: Marcus Sheffer, May 6, 2016, 12:27 pm |