Proper filenaming for uploading
NC-2009 PIf4:Schedule and Overview Documentsposted by Brooke Odom on
I have a simple questions but I can't seem to find the answer. What is the required filename format for uploading documents?
SSc4 how i must count residents
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Markus Henning on
Hi, in my project 10% oft the total building area are residential in the top floor of a office/retail building. My question is, how i must include the residents in the survey? Thanks
Recycling space inside vs. outside
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Michelle Rosenberger on
Tristan, As you can see from the two longer threads here, several of us are struggling with the issue of dedicated recycling areas inside the building vs.
100' Wetland - previously developed
NC-2009 SSc1:Site Selectionposted by Kris Phillips on
The credit requirements excuse "previously developed" sites for 1) the 100-year floodplain and 2) within 50' of a water body. This is not specifically mentioned 3) within 100' of wetlands.
Mechanical equipment compartments as roof surface
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Alessio Zampaglione on
Hi everyone, I’m working on a project registered under LEED 2009 C&S Rating System.
Vinegar Cleaner
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Erin Nuckols on
Our custodial team uses White and Apple Cider Vinegar Cleaner as a part of their cleaning procedure.
Commissioning and CO
posted by Paulina Marinkovic on
Can a certificate of occupancy be obtained without building commissioning in New York State?
Capitol Cost ECMs
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Robert Calloway on
When submitting the reports for a LEED RCx project, one of the reports is for Capital Cost Energy Conservation Measures.
Leed Rating system - multiple buildings
posted by Kevin Perry on
Hello, We are working on a project for a privately funded college on a single site, in existing multiple buildings.
Calibration report
EBOM-2009 WEc1:Water Performance Measurementposted by Patricia Fuertes on
We are pursuing this credit but meters in Spain are not calibrated nevermore once they are installed. When they are revised they are substituted if needed or every 4 years for example.