General forums
posted by  JOSE R. TAGLE  on 

Hi, I recently certifiied a Platinum LEED Project - "Arquitipo - UNARTE Project ID 1000018199" located in Puebla City, México.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Apr 12, 2013, 4:53 pm

Partial Commissioning at the time of submission

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Maya Karkour  on 

Hi, LEED allows to submit for Commissioning if 2 systems are completely commissioned. LEEDOnline differentiates between "Lighting Controls" and "Daylighting Controls".

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Apr 12, 2013, 1:44 pm

IEQc3.2 APPA audit compliance using ISO 90001

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  bayard fenwick  on 

Our client follows ISO 90001 audit guidelines (and has for years). The site team does an internal audit once a month, and conducts an ISO 90001 audit once a year.

2
Fri Apr 12, 2013, 1:19 pm

Calculating Perimeter views for Non-Inpatient Areas IEQ8.2 ?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Olivier Brouard  on 

Hi everyone, I am stuck with something not as straightforward as it sounds like. For IEQ Credit 8.2 LEED Healthcare Supplement provides a table named : 1- Perimeter Non-IPU Area with Window Acce

3
Default Avatar
Sustainable Energy Engineer
LEEDuser Basic Member
0 thumbs up
Thu Apr 11, 2013, 8:32 pm

Multiple CxAs?

CS-2009 EAc3:Enhanced Commissioning
posted by  Michael Kros  on 

Can the commissioning agent listed on the form for EAp1 Fundamental Commissioning be different from the CxA listed on the form for EAc3 Enhanced Commissioning?

3
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Thu Apr 11, 2013, 7:14 pm

Open grid pavement

NC-2009 WEc1:Water Efficient Landscaping
posted by  Alicia Villanueva  on 

Does open grid pavement (at least 50% pervious) count as vegetated area in this credit?

5
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Thu Apr 11, 2013, 5:28 pm

Daylit area

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Adrienn Gelesz  on 

For Option 1, do you think a space that does not have an external wall, but is within 15feet of the perimeter wall should be included in the credit requirements?

2
Principal
Clanton Associates
LEEDuser Basic Member
46 thumbs up
Thu Apr 11, 2013, 5:10 pm

Coating VOC vs. Material VOC

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Sara Greenwood  on 

I am working on a project that has spec'd some nice Frazee interior paint, but the MSDS sheets refer to both teh "coating VOC" and the "material VOC" contents. Which is compliant for our purposes?

3
Thu Apr 11, 2013, 3:46 pm