brownfield confusionNC-v4 LTc3: High priority siteposted by Larry Sims on Jul 1, 2014, 5:17 pm
Okay, I'll start this off by stating the requirement, and then asking a (simple) question. LEED v4 requirement: Locate on a brownfield where "soil or groundwater contamination has been... Last reply: Larry Sims, Dec 15, 2017, 12:41 pm |
|
List of Actual Material CostsNC-2009 MRc4: Recycled Contentposted by Jon Clifford on Jul 7, 2014, 8:36 pm
According to the Documentation Guidance in the Reference Guide, if we use the “Actual Material Cost” as the denominator in MR Credit calculations, we should “maintain a list of actual material... Last reply: Jon Clifford, Jul 15, 2014, 1:21 pm |
|
LEED v4 Green AssociateGeneral forumsposted by Tonima Ferdous on Jul 7, 2014, 11:14 am
I am planning to take the exam in September 2014. However, I came to know that the study guides will not be released until Fall 2014 (I am not sure about the specific date of release though).... Last reply: Tonima Ferdous, Jul 17, 2014, 9:33 am |
|
Radiance and EcotectNC-2009 IEQc8.1: Daylight and views - daylightposted by Lilian Martins on Jul 22, 2014, 9:45 am
Is it mandatory to run the model on Radiance when the model has been built up on Ecotect? Last reply: Eddy Santosa, Jul 22, 2014, 11:46 am |
|
epoxy for ceramic jointsNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Sahar Abi-Ziki on Sep 3, 2014, 12:23 pm
Hello, Last reply: Lilian Seow, Feb 6, 2015, 5:34 pm |
|
Pump consumptionCS-2009 EAp2: Minimum Energy Performanceposted by Toni Herena Montull on Sep 9, 2014, 5:53 am
I have a proposed design with boiler and chiller, with water distribution. There are many pumps in the distribution system. In the other hand, I have a baseline building with a system 5 (... Last reply: Francesco Passerini, Sep 15, 2014, 6:07 am |
|
kitchen hoodsNC-2009 EAp2: Minimum Energy Performanceposted by HOUCINE TLEMSANI on Sep 11, 2014, 10:23 am
Hi, Last reply: Marcus Sheffer, Oct 10, 2014, 3:54 pm |
|
Equipment Capacity for Design and Baseline CaseNC-2009 EAp2: Minimum Energy Performanceposted by April Brown on Sep 18, 2014, 12:29 pm
Hi Marcus et al., I received a question from one of our project energy modelers that I cannot answer - Recently we have been receiving a new comment on EAp2 that states Last reply: Marcus Sheffer, Oct 13, 2014, 8:32 pm |
|
Dear all, On my project, theNC-2009 MRc4: Recycled Contentposted by Caroline PIN on Sep 22, 2014, 12:49 pm
Dear all, On my project, the concrete contains Fly Ash (6%) and recycled aggregates (5%). Last reply: Jon Clifford, Sep 25, 2014, 12:04 pm |
|
GC Responsible for Implementing Option B?NC-2009 EAc5: Measurement and Verificationposted by Marcia Weekes on Sep 22, 2014, 2:50 pm
Does anyone have any experience with projects where a... Last reply: Matthew VanSweden, Sep 8, 2016, 11:29 am |