Topic | Recent |
---|---|
Additional floors of existing buildingNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Apr 18, 2016, 4:10 am
Our project is the major renovation of an existing building. We have added 2 new floors on the top. 1. Because of the top two new floors, does the baseline building need to be rotated as... Last reply: Marcus Sheffer, Apr 25, 2016, 4:44 pm |
|
Bike racks for adjacent buildings?NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Becky Dix on May 13, 2016, 11:39 am
This project is an academic building on a higher education campus in the United States. The campus does not have a robust inventory of LEED buildings, but is attempting to make strides towards... Last reply: Michelle Robinson Schwarting, May 16, 2016, 9:12 am |
|
v2009_Minimum Energy Performance Calculator_v6NC-2009 EAp2: Minimum Energy Performanceposted by Alice chen on Jan 4, 2017, 11:13 am
Hi All, I am working on a warehouse project targeting at LEED 2009 certification. I need to fill up the v2009_Minimum Energy Performance Calculator_v06 as part of the submission (if I... Last reply: Cory Duggin, Jan 10, 2017, 10:03 am |
|
Perimeter Zones Requirements for WarehouseNC-2009 EAp2: Minimum Energy Performanceposted by Alice chen on Jan 12, 2017, 4:12 am
Hi All, I am working on a large warehouse project, which is an open space with the area of 10,000 square meter. This project is targeting at LEED 2009. As the space is quite big, I just... Last reply: Cory Duggin, Jan 13, 2017, 10:47 am |
|
Bike RacksNC-2009 MRc4: Recycled Contentposted by Michael Sugar III on Jan 30, 2017, 5:25 pmSince you are posting in the LEED-2009 forum, I assume you are working on a LEED-2009 project. For that project, you cannot include MEP. Log in or register to post comments Debra a. Lombard Construction... Last reply: Debra a. Lombard, Apr 7, 2017, 2:12 pm |
|
construction managementNC-2009 MRc5: Regional Materialsposted by Zu-Ning Chang on Mar 13, 2017, 9:01 am
Hello, I am curious about that how do LEED determine the regional distance of material is 500 miles? Thank you in advance for the answer. Last reply: RETIRED, Mar 28, 2017, 10:36 am |
|
Changing rooms in adjacent LEED buildingNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Instra Ingenieros on Jun 30, 2017, 4:57 am
We have a project with an existing LEED adjacent building to the new LEED building. Both buildings are conected by the interior and the exterior and owned by the same landlord. The... Last reply: Sophie Kerr, Apr 30, 2018, 12:25 pm |
|
Parking Garage & exterior Site Lighting part of building Energy Model?NC-2009 EAp2: Minimum Energy Performanceposted by Adrian Arenas on May 2, 2018, 11:39 am
We Have two building pursuing LEED v2009 NC, both building share an underground parking garage. 1) Should we include the artificial Lighting in the Parking Garage (serving LEED... Last reply: Marcus Sheffer, Mar 27, 2023, 12:50 pm |
|
Simulating Electrical System as back up for Solar Hot Water SystemNC-2009 EAp2: Minimum Energy Performanceposted by Achelles DSouza on Nov 11, 2020, 4:22 am
I am simulating a hotel building. Domestic hot water requirement will be contributed by solar powered calorifier. Electric hot water system will be provided for back up. Is it fine if I neglect... Last reply: Achelles DSouza, Nov 11, 2020, 10:59 pm |
|
Waste Hauler sorts off-siteEBOM-2009 MRc6: Solid waste management - waste stream auditposted by Kevin Kelly on Apr 1, 2010, 4:33 pm
The project that I am working on has one single waste hauler. As per NYC regulations all the trash and recycling are in separate bags, but other than that everything is sorted off site. We have... Last reply: Tristan Roberts, Sep 23, 2010, 5:49 pm |