Topic | Recent |
---|---|
LEED BD+C v4: SSc2- Greenfield vs previously disturbedNC-v4 SSc2: Site development - protect or restore habitatposted by Ricardo Sá on Nov 6, 2018, 11:05 am
Hi, We are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation).... |
|
LEED BD+C v4: Specific certification strategies for wineriesNC-v4 LTc5: Access to quality transitposted by Ricardo Sá on Nov 6, 2018, 11:19 am
Hi, We are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation).... |
|
Parking ReductionNC-v4 LTc7: Reduced parking footprintposted by Karl Heitman on Nov 6, 2018, 11:49 am
Our project is a "last mile" distribution center where there's a car staging area for delivery. Does this count towards parking? I assume the staging area is considered part of facility... |
|
CARB Testing Method 310 for Low-Emitting Material ComplianceNC-v4 EQc2: Low-emitting materialsposted by Gray Bender on Nov 6, 2018, 6:48 pm
Hello, We have an adhesive manufacturer claiming that they have complied with the Low-Emitting Materials testing requirements by undertaking... |
|
IAQ testingSchools-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Danielle Dunn on Nov 7, 2018, 1:51 pm
"One test is required for each separate ventilation system within the building, with not less than one sample per 25,000 ft2 of contiguous floor area." Is this statement... |
|
Manufacturer on the list CARB TPC-exemptNC-v4 EQc2: Low-emitting materialsposted by Linh Vu on Nov 8, 2018, 1:38 am
Hello, I have a question concerning... |
|
Multizone VAV with FCUsNC-v4 EQp1: Minimum indoor air quality performanceposted by Gopinath Vasu on Nov 12, 2018, 1:55 am
Hi All, I am working in a project where FCUs (cooling only) system with VAVs are used to condition the group of spaces. The fresh air supply to the space is from TFA system. From TFA, the... |
|
Table 1 when I have only one transit type: BusNC-v4 LTc5: Access to quality transitposted by Konstantina Kalliakoudi on Nov 12, 2018, 6:58 am
Hello to all, I have following questions: In my project I have only one transit type: Bus. 1) Can I use Table 1 " Minimum daily transit for projects with multiple transit types (bus... |
|
Mulitzone FCU with VAVCI-v4 EQp1: Minimum indoor air quality performanceposted by Gopinath Vasu on Nov 14, 2018, 2:14 am
Hi All, I am working in a project where FCUs (cooling only) system with VAVs are used to condition the group of spaces. The fresh air supply to the space is from TFA system. From TFA, the... |
|
Option 2- threshold of 30% of the costs attributed Structure and EnclosureCS-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Barry Farren on Nov 14, 2018, 6:48 am
For Option 2, demonstrating that 25% of the cost of the project materials meet REACh compliance, There is a requirement that only 30% of these material costs can be attributed to the... |