Option 1 BustNC-v4 EQc4: Indoor air quality assessmentposted by Michelle Rosenberger on Oct 8, 2018, 2:33 pm
Is there any recourse if you go for an Option 1 flushout and fail to meet the temp or humidity limit at any point during the duration? If for example you exceed the relative humidity or temp for... |
|
Radon in school buildingNC-v4 EQp1: Minimum indoor air quality performanceposted by Luis Andrade on Oct 9, 2018, 10:26 am
Hello, In order to meet EQp1 requirements, do non-residential projects need to address radon issues in the first 4 floors? It is my understanding that only residential projects need to... |
|
Option 2, Strategy E- Exterior glazing possible exclusion from calc?NC-v4 EQc6: Interior lightingposted by FABIO VIERO on Oct 9, 2018, 12:57 pm
Since the Option 2, strategies F (partitions), G (floor, wall and ceiling) and H (partition) excluding the fenestrations form calculation, I'm wondering if the exclusion can be apply for the... |
|
Ozone Filtration in C&S V3 BuildingNC-v4 EQp1: Minimum indoor air quality performanceposted by Jose Antonio Velazquez Ambrosio on Oct 9, 2018, 5:09 pm
Hello everybody. We have a V4 interior certification design for HVAC in a building that is LEED V3, so the C&S infrastructure do not have a... |
|
thinner use for cleaning purposesCS-v4 EQc2: Low-emitting materialsposted by monica castro urbina on Oct 11, 2018, 5:18 pm
The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the... |
|
Food production in a Business District?ND-Plan-v4 NPDc13: Local food productionposted by Sareet Benayahu on Oct 16, 2018, 4:06 am
Hi. our LEED ND Plan project is for a business and retail sector, with congress halls and hotels. no residential units are planned. Can the project be eligible for these points if there is a... |
|
CxA firm or an individualNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Omar Elrawy on Oct 16, 2018, 6:46 am
Dear All, I need to know if the... |
|
Prevention Through DesignHealthcare-v4 INc1: Innovationposted by Katherine Zanecosky on Oct 17, 2018, 3:39 pm
Hi fellow LEED Users? Has anyone else attempted the Prevention Through Design credit? If so, Did you experience any issues with meeting requirements? What... |
|
Attached building within the LEED boundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by Omar Elrawy on Oct 17, 2018, 5:25 pm
I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED. I need to know if that complies with... |
|
thinnerCS-v4 EQc2: Low-emitting materialsposted by ilse angel on Oct 18, 2018, 1:00 pm
Hi! does the use of thinner for cleaning purposes falls within the scope of this credit? Do we have to comply with the requirements of the rule 1143? Thanks! |