Option 1 Bust

NC-v4 EQc4: Indoor air quality assessment
posted by Michelle Rosenberger on Oct 8, 2018, 2:33 pm

Is there any recourse if you go for an Option 1 flushout and fail to meet the temp or humidity limit at any point during the duration? If for example you exceed the relative humidity or temp for...

Radon in school building

NC-v4 EQp1: Minimum indoor air quality performance
posted by Luis Andrade on Oct 9, 2018, 10:26 am

Hello,

In order to meet EQp1 requirements, do non-residential projects need to address radon issues in the first 4 floors? It is my understanding that only residential projects need to...

Option 2, Strategy E- Exterior glazing possible exclusion from calc?

NC-v4 EQc6: Interior lighting
posted by FABIO VIERO on Oct 9, 2018, 12:57 pm

Since the Option 2, strategies F (partitions), G (floor, wall and ceiling) and H (partition) excluding the fenestrations form calculation, I'm wondering if the exclusion can be apply for the...

Ozone Filtration in C&S V3 Building

NC-v4 EQp1: Minimum indoor air quality performance
posted by Jose Antonio Velazquez Ambrosio on Oct 9, 2018, 5:09 pm

Hello everybody. We have a V4 interior certification design for HVAC in a building that is LEED V3, so the C&S infrastructure do not have a...

thinner use for cleaning purposes

CS-v4 EQc2: Low-emitting materials
posted by monica castro urbina on Oct 11, 2018, 5:18 pm

The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the...

Food production in a Business District?

ND-Plan-v4 NPDc13: Local food production
posted by Sareet Benayahu on Oct 16, 2018, 4:06 am

Hi. our LEED ND Plan project is for a business and retail sector, with congress halls and hotels. no residential units are planned. Can the project be eligible for these points if there is a...

CxA firm or an individual

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Omar Elrawy on Oct 16, 2018, 6:46 am

Dear All,

I need to know if the...

Prevention Through Design

Healthcare-v4 INc1: Innovation
posted by Katherine Zanecosky on Oct 17, 2018, 3:39 pm

Hi fellow LEED Users?

Has anyone else attempted the Prevention Through Design credit?  If so,

Did you experience any issues with meeting requirements?

What...

Attached building within the LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Omar Elrawy on Oct 17, 2018, 5:25 pm

I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED.  I need to know if that complies with...

thinner

CS-v4 EQc2: Low-emitting materials
posted by ilse angel on Oct 18, 2018, 1:00 pm

Hi! does the use of thinner for cleaning purposes falls within the scope of this credit?

Do we have to comply with the requirements of the rule 1143?

Thanks!