Does Electric Cables with EPD can count as one product for this credit?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by CHANTAL CARIUS on Aug 16, 2018, 2:25 pm

We are helping to achieve Platinum certification for one building in Mexico City. There is a lack of EPD's in our country so we are trying very hard to get at least one point of this credit....

Escalator for Continuous sidewalks

ND-v4 NPDc1: Walkable Streets
posted by Nuttanee Vongveeranonchai on Aug 17, 2018, 5:22 am

Hi everyone, 

We have an issue in “j. Continuous sidewalks” which requires having 1.5 meters and 3 meters sidewalk along the entire circulation network. 
As our circulation network...

Advanced Enegy Metering Credt form- Option # 2

CI-v4 EAc3: Advanced Energy Metering
posted by Michael Archer on Aug 21, 2018, 12:49 pm

Is "Permanent" an acceptable response to 'Meter Type' in the Advanced Meters Table of the Advance Metering Credit form?  If not, what is the form looking for?

Thank you.

Shaftliners in interior wall assemblies

NC-v4 EQc2: Low-emitting materials
posted by Vandita Mudgal on Aug 22, 2018, 5:15 pm

Do Shaftliners in the interior wall assemblies fall under the Low-Emitting Material category for CDPH v1.1 2010...

Exceptions to the 10-foot (3-meter) distance- alternative systems?

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Kevin Gilleran on Aug 23, 2018, 7:02 pm

Hi,

We are interested in integrating the permanent entryway systems in a ground floor beer pub. The pub has a patio with multiple doors. It looks like these doors to the patio are...

Regular Building Occupant

Discuss the LEED Dynamic Plaque and Arc
posted by Luiza Junqueira on Aug 23, 2018, 8:30 pm

How do I find out the regular building occupant on a multi tenant building for ARC?

V4 Enhanced Cx / MBCx LEED submissions

CI-v4 EAc1: Enhanced Commissioning
posted by Erin Rowe on Aug 23, 2018, 10:23 pm

Hi all - 

Just getting ready to submit project documentation, and wanted to see if anyone had any advice, based on any review feedback, re: Enhanced Commissioning and in particular the...

Flush out option-1 for spaces like Stairwells and Elevator shafts

NC-v4 EQc4: Indoor air quality assessment
posted by Nishank Shah on Aug 24, 2018, 9:21 am

According to the language used in this credit, we are supposed to perform a building flush-out of the...

ID credit for modular construction

NC-2009 IDc1: Innovation in Design
posted by Gail Napell on Aug 24, 2018, 4:28 pm

Hi all

looking for the credit language for an ID credit called 'IDEP Modular Construction'  - can anyone confirm language for this and by chance know if it's a 'retired' credit?  thank you...

Compliance with 90.1 6.4.4.2.2?

CI-v4 EAp1: Fundamental commissioning and verification
posted by emily reese moody on Aug 27, 2018, 3:38 pm

A question from my...