Topic | Recent |
---|---|
Does Electric Cables with EPD can count as one product for this credit?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by CHANTAL CARIUS on Aug 16, 2018, 2:25 pm
We are helping to achieve Platinum certification for one building in Mexico City. There is a lack of EPD's in our country so we are trying very hard to get at least one point of this credit.... |
|
Escalator for Continuous sidewalksND-v4 NPDc1: Walkable Streetsposted by Nuttanee Vongveeranonchai on Aug 17, 2018, 5:22 am
Hi everyone, We have an issue in “j. Continuous sidewalks” which requires having 1.5 meters and 3 meters sidewalk along the entire circulation network. |
|
Advanced Enegy Metering Credt form- Option # 2CI-v4 EAc3: Advanced Energy Meteringposted by Michael Archer on Aug 21, 2018, 12:49 pm
Is "Permanent" an acceptable response to 'Meter Type' in the Advanced Meters Table of the Advance Metering Credit form? If not, what is the form looking for? Thank you. |
|
Shaftliners in interior wall assembliesNC-v4 EQc2: Low-emitting materialsposted by Vandita Mudgal on Aug 22, 2018, 5:15 pm
Do Shaftliners in the interior wall assemblies fall under the Low-Emitting Material category for CDPH v1.1 2010... |
|
Exceptions to the 10-foot (3-meter) distance- alternative systems?CI-v4 EQc1: Enhanced indoor air quality strategiesposted by Kevin Gilleran on Aug 23, 2018, 7:02 pm
Hi, We are interested in integrating the permanent entryway systems in a ground floor beer pub. The pub has a patio with multiple doors. It looks like these doors to the patio are... |
|
Regular Building OccupantDiscuss the LEED Dynamic Plaque and Arcposted by Luiza Junqueira on Aug 23, 2018, 8:30 pm
How do I find out the regular building occupant on a multi tenant building for ARC? |
|
V4 Enhanced Cx / MBCx LEED submissionsCI-v4 EAc1: Enhanced Commissioningposted by Erin Rowe on Aug 23, 2018, 10:23 pm
Hi all - Just getting ready to submit project documentation, and wanted to see if anyone had any advice, based on any review feedback, re: Enhanced Commissioning and in particular the... |
|
Flush out option-1 for spaces like Stairwells and Elevator shaftsNC-v4 EQc4: Indoor air quality assessmentposted by Nishank Shah on Aug 24, 2018, 9:21 am
According to the language used in this credit, we are supposed to perform a building flush-out of the... |
|
ID credit for modular constructionNC-2009 IDc1: Innovation in Designposted by Gail Napell on Aug 24, 2018, 4:28 pm
Hi all looking for the credit language for an ID credit called 'IDEP Modular Construction' - can anyone confirm language for this and by chance know if it's a 'retired' credit? thank you... |
|
Compliance with 90.1 6.4.4.2.2?CI-v4 EAp1: Fundamental commissioning and verificationposted by emily reese moody on Aug 27, 2018, 3:38 pm
A question from my... |