Log in
Forum
Topic

IEQc1 and IEQc2

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Carolina Vergnano on Oct 28, 2010, 7:52 am

If I comply with the IEQc1 using airflow measurement device that measures outdoor air intake flow with accuracy of plus or minus 15% of design minimum outdoor air rate, as defined by ASHRAE 62.1...

Last reply: Scott DeGaro, Nov 26, 2010, 12:55 pm

Mechanical floors

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Billy Ng on Nov 26, 2010, 10:29 am

I have a mechanical floor that is boxed in with no windows. this floor is just...

Last reply: Scott DeGaro, Nov 26, 2010, 11:57 am

Vending Machines

EBOM-2009 EAc5: Enhanced Refrigerant Management
posted by Laura Girard on Nov 16, 2010, 12:08 pm

We have a number of refrigerated vending machines on our facility that are not owned or operated by the building owner. We could not read any nameplates due to installation and safety concerns...

Last reply: Dan Ackerstein, Nov 24, 2010, 4:03 pm

Hi, My project is a Cookies

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Jose Salinas on Nov 24, 2010, 11:04 am

Hi,
My project is a Cookies and Potato Chips facility (from a well known brand) I has an offices building, services, laboratories, and Production Lines. It was built and operates since two...

Last reply: Dan Ackerstein, Nov 24, 2010, 3:57 pm

I have a problem with owners allowing the GC to name the CA

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Alfredo Benavides on Sep 15, 2009, 12:28 am

Despite the owner's high level of confidence on his...

Last reply: Lannie Farmer, LEED AP BD&C; QCxP, Nov 24, 2010, 2:01 pm

IEQ7.1 Template Requirements

NC-2009 IEQc7.1: Thermal comfort - design
posted by susan eguia on Nov 19, 2010, 4:31 pm

Hi,

We have Library LEED Project and I'm using the template under LOv3. Can somebody please help me how to fill-up the Clothing level (CLO) and Metabolic Rate (MET)?

Appreciate...

Last reply: James Del Monaco, Nov 24, 2010, 10:53 am

Thank you

General forums
posted by Terry Squyres on Nov 24, 2010, 10:31 am

Thank you to everyone for creating and sharing these guides, and to LEEDuser for making them accessible.

Base line for commutes

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Robert McNeice on Jan 12, 2010, 11:48 am

Your Checklists sections says that "The baseline is calculated by assuming that each regular building occupant drives alone to and from the project building twice a day, five days a week, in a...

Last reply: Simon Sue, Nov 23, 2010, 9:52 pm

Fire Stopping Caulk and Sealants

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Lauren Sparandara on Nov 22, 2010, 5:16 pm

What is the...

Last reply: Kristy O'Hagan, Nov 23, 2010, 1:28 pm

Insulation: Is it a bird, is it a plane...no it's...

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Jean Marais on Nov 23, 2010, 6:30 am

This project is using an insulation made of 92% recycled news paper. The other 8% are what holds it together. I've got an extensive list of the substances including...

Last reply: Tristan Roberts, Nov 23, 2010, 11:50 am