Topic | Recent |
---|---|
Information needed for ARCSKORU toolsLEED-NC v4 Explained in Two Pagesposted by Subrota Roy on Jul 31, 2017, 3:26 amHi, While we get the score (say 35) then after that if we target some point and implement the... |
|
Bike Commuting- Lockable Changing AreaRetail-NC-v2009 SSc4: Alternative Transportationposted by Lyle Axelarris on Apr 12, 2018, 8:59 pm
The project has an employee locker room with an attached single ADA bathroom. The bathroom is large enough to change in, and is lockable. However, the door to the locker room is not lockable. ... |
|
LEED v4 MRc1 LCA credit now officially accepts EN standards as ACP for EuropeNC-v4 MRc1: Building life-cycle impact reductionposted by Panu Pasanen on Apr 13, 2018, 2:05 am
A welcome clarification for all LEED projects in Europe! The Alternative Compliancy Path for Europe is now official and allows applying EN 15978 as the LCA framework. Credit language: ... |
|
Modeling System-8CI-v4 EAc2: Optimize Energy Performanceposted by Gustav Alfaro on Apr 14, 2018, 7:17 pm
Hi to all, Our project scope is modeling one floor of a 20 stories office building. It is clear that we must use system 8 for the baseline based on the full office building... |
|
Process water in a cosmetic storeRetail-NC-v4 WEc4: Water meteringposted by Charline SEYTIER on Apr 16, 2018, 7:52 am
In a retail store selling cosmetics, do fixtures installed in the sales area, used in the process of selling products (to wash hands after applying a product), count as process water for this... |
|
smoke ventsWarehouses-NC-v4 EQc2: Low-emitting materialsposted by Agnieszka Rylska on Apr 16, 2018, 8:42 am
The ceiling of the warehouse is supplied with smoke vents. The smoke vents play role in fire protection, provide daylight and water protection. They consist of PVC profiles, polycarbonate sheet,... |
|
Pneumatic Controls- Monitoring Based CxCI-v4 EAc1: Enhanced Commissioningposted by Christopher Lim on Apr 20, 2018, 3:40 pm
I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building. The client has asked if it's possible to go... |
|
Multi-occupant spaces required?Retail-CI-v4 EQc6: Interior lightingposted by Jared Silliker on Apr 20, 2018, 4:10 pm
I find the reference guide confusing on this credit. Am I reading it correctly that multi-occupant spaces do NOT need to be addressed for lighting controls within v4 Retail projects? Multi... |
|
About Spray adhesives, Material has voc g/l limit and Greenguard certificate.NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Eunjoo Park on Apr 23, 2018, 8:39 am
My project is located in South Korea, so I open fall into difficulties to interpret manufacture data. About Spray adhesives, material has voc g/l limit and Greenguard certificate. ... |
|
Spray adhesives has VOC Contents and GREENGURAD certificate also. This material can be use?NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Eunjoo Park on Apr 23, 2018, 8:54 am
My project located in South Korea. So I often fall into difficulties to interpretation manufacture data. The material is "Scotch-WeldTM Hi-Strength Postforming 94 CA". As per the... |