Chiller Selection for Baseline
NC-2009 EAc1:Optimize Energy Performanceposted by Poorva Keskar on
We are working on a project where the total project has five towers on one podium. We are certifying only one tower for LEED-NC with an area of 34152 sq.m.
Chemical storage room with recirculating HVAC cooling system
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Hello, One of the LEED requirements of this credit is: "[For rooms with chemicals / hazardous gases], the exhaust rate must be at least 0.50 CFM per sq. ft.
Warning for net-zero projects.
NC-2009 EAc6:Green powerposted by Hernando Miranda on
The GBCI has decided that net-zero projects must buy additional EAc6 green power if the actual energy use for two-years post-occupancy does not match the GBCI approved results from EAc1/EAc2.
Green Roof over an underground parking garage
NC-2009 SSc7.2:Heat Island Effect—Roofposted by adi ashkenazi on
Can I calculate the green roofs over an underground parking garage? (I calculated them as part of the landscape for SS CR 7.1-non roof) Thanks
Online documentation clarification
NC-2009 SSc1:Site Selectionposted by BABAR MEHMOOD on
As i checked online submittal template, it seems that we only have to mark the check box, do we have to need to submitt any documentation for the requirements mentioned in this credit.
DES should be encourage!
NC-2009 EAc1:Optimize Energy Performanceposted by jose Babilonia on
We are modeling a new LEED school building that is an addition of an existing complex buildings. The simulation was made using HAP.
LEED V.4 and LEED AP Exams
posted by Hasitha Herath on
i heard that LEED V.4 is on the way. i am planning to take LEED AP (BD+C) exams in end of September? since LEED V4 is coming will there be changes to the scope of the exam?
LEED Online Form for MR Cr. 4 used V 3 to convert to V 4
NC-2009 MRc4:Recycled Contentposted by Benjie Herrera on
The LEED online V3 form of MR Cr 4 requires to type item by item sustainable materials on the form while V4 form requires only to upload material calculator worksheet and then type the total cost
Line of Sight from Workstations
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Andrew Ellsworth on
I have two questions that may seem nitpicky, but are relevant to achieving this credit.
green house and daylighti credit
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Oleg Petryuchenko on
We have large warehouse project that also has a green house as a part of the building. could this area be excluded from daylighting?