basecase SystemNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on May 8, 2017, 5:12 am
Dear Concern:- Greetings Our project is G+5 but A/c spaces are located in 3 Floors only and A/c area is totally below 10000 Square feet only (electrical heating only) so we... Last reply: SAMY Chamy, May 11, 2017, 3:06 am |
|
Baseline Chiller plant- System7NC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on May 27, 2017, 8:17 am
Greetings, 1. Proposed project is arranged with water cooled chillers and dry coolers (... Last reply: Vassil Vassilev, May 30, 2017, 8:47 am |
|
LEED methodology for calculating water use/efficiency baselineNC-2009 WEp1: Water Use Reductionposted by Kwame Emmanuel on May 30, 2017, 2:50 pm
Greetings, I am currently researching the LEED methodology for calculating a water use/efficiency baseline for the housing sector. Any links or advice would be greatly appreciated. Regards. Last reply: Charles Nepps, Jun 6, 2017, 4:40 pm |
|
Co-processing as an approach to Waste ManagementCS-2009 MRc2: Construction Waste Managementposted by Katherine Ann Resurreccion on Jun 1, 2017, 2:41 am
Hi All, Last reply: Katherine Ann Resurreccion, Jul 24, 2017, 11:56 pm |
|
Roof Top PatioNC-v4 SSc5: Heat Island Reductionposted by Irene Chung on Jun 6, 2017, 1:23 pm
Hello, 1/4 of my project's... Last reply: Lise Dannesboe, Jan 11, 2018, 7:31 am |
|
IEQ 0 VOC General Emissions Test Needed?NC-v4 EQc2: Low-emitting materialsposted by Jenelle Shapiro on Jun 15, 2017, 7:27 pm
If any wet applied product is shown to have 0 VOCs, does it still need a general emissions evaluation? Last reply: Reinhard Oppl, Jul 12, 2018, 3:50 pm |
|
is there a compliance path for multiple baselines?NC-2009 EAp2: Minimum Energy Performanceposted by Courtney Royal on Jun 20, 2017, 1:29 am
Can LEED v2009 projects (which has ASHRAE 90.1-2007 baseline) demonstrate compliance using ASHRAE 90.1-2013? Is there any adjusted point scale which can be applicable for such projects? We have a... Last reply: Marcus Sheffer, Nov 1, 2017, 3:15 pm |
|
Guide LanguageNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by PAWAN DAHIWAL on Jun 22, 2017, 8:25 am
Under several material credits its mentioned that "Procure 20 different permanently installed item from 5 different manufacturer"...for EPD/CSR My question is, Last reply: Joanna Switzer, Dec 29, 2017, 7:20 am |
|
Warehouses & EV Charging stations on parkingWarehouses-NC-v4 LTc8: Green vehiclesposted by Charline SEYTIER on Jun 23, 2017, 5:11 am
Dear all, Last reply: Shannon Oletic, Nov 12, 2021, 10:43 am |
|
System 9- BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jul 4, 2017, 5:07 am
Greetings, Last reply: Marcus Sheffer, Jul 14, 2017, 12:36 pm |