Forum quick links
Exhaust System - Item 5.18.5
CI-2009 IEQp1:Minimum IAQ Performanceposted by Carolina Vergnano on
Hi, I'm working in a project that has operable windows in the toilets.
Baseline building requried to have demand control ventilation?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
Per 90.1-2007 section 6.4.3.9 "Ventilation Controls for High-Occupancy Areas" systems are required to have DCV given certain criteria.
designated exhaust systems
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Charline SEYTIER on
Our Office building is ventilated with only 100% Outside Air Systems and thus there is no recirculation.
MRc7 and MRc6
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Gabriel Frasson on
My client is a multi-tenant.
DCV control
NC-2009 IEQp1:Minimum IAQ Performanceposted by Rudolph Carneiro on
Can someone help me with exception "b" of mandatory section 6.4.3.9 in 90.1. What is meant by the following: b.
Health Care vs Canada New Construction 2009
NC-2009 EAc3:Enhanced Commissioningposted by Shevaun Barrie on
Hi, Does anyone know if there are any extra requirements aside from the optional BECx in LEED for HC vs Canada NC 2009? I can't see any but have been told there are more visits required.
INVOICE DOCUMENTATION, ENVIRONMENTAL MATERIALS FORM QUESTION
CI-2009 MRc4:Recycled Contentposted by Shane Tohara on
I am working on my first LEED project so I apologize for this newbie question.
How to define and justify the value of the air speed?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Cédric Marzolf on
Hello, In first place, I apologize for my English.
Clarification for credit application
Pilot-Credits WEpc18:Appliance and process water use reductionposted by monu goyal on
hii, we are doing a LEED-CI project, in our project scope I found Dishwasher only water consuming appliance, with this can I apply for this credit and whether this will be acceptable or not??
Energy Star's energy report
NC-2009 EAc5:Measurement and Verificationposted by Soo young No on
According to EA5 Measure and verification, required 1 year of energy usage report. But in PI from 1: Minimum Program Requirement (PIf1-1), required for duration of five years. Is it under same Ener