New to AGMBC

LEED Guidance for Campuses and Multiple Buildings
posted by  Henrique Mendes  on 

Hi there. We have a client that has 6 projects of buildings to be constructed at different location. But all this 6 projects are the same.

2
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Wed Oct 16, 2013, 1:00 pm

PV System as part of a Master Site

CS-2009 EAc2:On-site Renewable Energy
posted by  Ben Tucker  on 

Does anyone have any experience submitting for EAc2 as part of a Master Site? Our project is a campus project that will contain three buildings.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 15, 2013, 8:48 pm

Gross Square Footage and Building Footprint.

NC-2009 PIf2:Project Summary Details
posted by  Lynne Martin  on 

Our project is a one story learning/conference center. In this case is the gross square footage the same as the building footprint?

3
Default Avatar
Interior Designer
Diversified Design Group LLC
LEEDuser Basic Member
1 thumbs up
Tue Oct 15, 2013, 8:34 pm

Testing Exhaust Fans

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  cathy keagle  on 

Does anyone have advice for a building where we are unable to find the drawings which specify the Design CFM for some of the exhaust fans?

3
Tue Oct 15, 2013, 7:02 pm

Residential project

LEED Rating System Selection
posted by  Emmanuel Pauwels  on 

We will start a residential project (more then 4 stories) The client is a developer who will sell and rent out the appartments.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Oct 15, 2013, 6:19 pm

Baseline for hospitals

NC-2009 EAp2:Minimum Energy Performance
posted by  Lise Dannesboe  on 

Hej! As there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for hospitals?

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 15, 2013, 3:50 pm

Data Centers baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Gustav Alfaro  on 

Hi to all: We are modeling a data center under LEED v2009, but we need to show savings in the process loads (servers, UPS and transformers) since the achieved savings in HVAC and lighting systems

3
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up
Tue Oct 15, 2013, 3:39 pm

Complicated CHW distribution & pump energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Charline SEYTIER  on 

We are facing a complicated CHW distribution in one of our energy model, we have 2 chillers feeding a constant flow primary loop that serve heat exchangers. From the heat exchangers start several

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 15, 2013, 3:07 pm

Metering Faucets - why the "standard" requirement/limitation?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Robinson Schwarting  on 

There's been a lot of talk recently about the auto-control / metering faucet requirement in LEED via the "Water Use Reduction Additional Guidance" document.

3
Default Avatar
Architect, LEED Consultant
Polk Stanley Wilcox Architects
LEEDuser Basic Member
29 thumbs up
Tue Oct 15, 2013, 2:42 pm

Dishwashers included?

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Alicia Villanueva  on 

Dishwashers should not be included in the form correct?

5
LEED AP BD+C, O+M, Managing Director
L GEES 智利捷达
LEEDuser Basic Member
1 thumbs up
Mon Oct 14, 2013, 5:20 pm