Forum quick links
New to AGMBC
posted by Henrique Mendes on
Hi there. We have a client that has 6 projects of buildings to be constructed at different location. But all this 6 projects are the same.
PV System as part of a Master Site
CS-2009 EAc2:On-site Renewable Energyposted by Ben Tucker on
Does anyone have any experience submitting for EAc2 as part of a Master Site? Our project is a campus project that will contain three buildings.
Gross Square Footage and Building Footprint.
NC-2009 PIf2:Project Summary Detailsposted by Lynne Martin on
Our project is a one story learning/conference center. In this case is the gross square footage the same as the building footprint?
Testing Exhaust Fans
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by cathy keagle on
Does anyone have advice for a building where we are unable to find the drawings which specify the Design CFM for some of the exhaust fans?
Residential project
posted by Emmanuel Pauwels on
We will start a residential project (more then 4 stories) The client is a developer who will sell and rent out the appartments.
Baseline for hospitals
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hej! As there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for hospitals?
Data Centers baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Gustav Alfaro on
Hi to all: We are modeling a data center under LEED v2009, but we need to show savings in the process loads (servers, UPS and transformers) since the achieved savings in HVAC and lighting systems
Complicated CHW distribution & pump energy
NC-2009 EAp2:Minimum Energy Performanceposted by Charline SEYTIER on
We are facing a complicated CHW distribution in one of our energy model, we have 2 chillers feeding a constant flow primary loop that serve heat exchangers. From the heat exchangers start several
Metering Faucets - why the "standard" requirement/limitation?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Robinson Schwarting on
There's been a lot of talk recently about the auto-control / metering faucet requirement in LEED via the "Water Use Reduction Additional Guidance" document.
Dishwashers included?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alicia Villanueva on
Dishwashers should not be included in the form correct?