Topic | Recent |
---|---|
Option 2: Floor Area ClarificationNC-2009 IEQc8.1: Daylight and views - daylightposted by Shannon Terrell on Mar 21, 2011, 6:24 pm
If my... Last reply: Eddy Santosa, Apr 1, 2011, 6:09 pm |
|
Purchasing REC's after the submittal?EBOM-2009 EAc4: On-Site and Off-Site Renewable Energyposted by Alice Cook on Dec 21, 2010, 11:28 am
The building owner for our project would like to purchase... Last reply: Lana Malone, Apr 1, 2011, 4:15 pm |
|
Multi-parameter alternative product analysisPilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Jeff Gearhart on Mar 24, 2011, 9:51 am
We are pursuing this credit for a CI project. Interested in any further guidance on "multi-parameter alternative product analysis". I have done and seen a variety of alternatives assessments,... Last reply: Whit Faulconer, Apr 1, 2011, 3:18 pm |
|
Regional PrioritiiesCI-2009 RPc1: Regional Priorityposted by Kathleen Burke on Apr 1, 2011, 1:34 pm
there are sip codes missing for the enitre Kansas City Missouri area-64105, 64106, 64108, etc-i caled the USGBC and the person said that maybe that means there are n't any for that area-I don't... Last reply: Shillpa Singh, Apr 1, 2011, 1:54 pm |
|
Flowing water Pressure for Kitchen SinkNC-2009 WEp1: Water Use Reductionposted by Yong Lee Low on Mar 1, 2011, 5:29 am
My project is a commercial building. All the fittings except Kitchen sink have been finalized. by assuming a flowrate of 4.3L/min for sink, I have 36% savings and so have advised the architect... Last reply: Erica Downs, Apr 1, 2011, 8:35 am |
|
Flush Flow Rate MeasurmentEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Everardo Ocampo on Oct 4, 2010, 5:33 pm
Can someone please advise me on how to measure flush flow rates (i.e., urinals, water closets)? I know LEED wants us to do measurements for a 20% sample of fixtures with unknown flow rates. I'm... Last reply: university hall, Mar 31, 2011, 11:33 pm |
|
Error Message when trying to select CompleteEBOM-2009 WEc1: Water Performance Measurementposted by Cynthia Fowler on Mar 31, 2011, 8:36 am
I get the following message when I try to click "Complete" for the credit: Last reply: Barry Giles, Mar 31, 2011, 10:54 pm |
|
Old and Tankless Toilets have NO label of Flow RatesNC-2009 WEp1: Water Use Reductionposted by university hall on Mar 31, 2011, 2:36 pm
We are working on a University Administrative Building where the toilet fixtures are old, connected to the wall, without a tank, and have no labels of flow rates. How do we measure the flow rate... Last reply: David Posada, Mar 31, 2011, 8:49 pm |
|
BAS Lighting ControlsEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Nell Boyle on Jun 14, 2010, 2:04 pm
What level of lighting controls are acceptable for LEED? Do a certain percent of building lights have to be controlled by the BAS or is there some other measure? Maybe this requirement could be... Last reply: Kimberly Frith, Mar 31, 2011, 2:32 pm |
|
Must have VAV system for Option 1?CI-2009 EAc1.3: Optimize energy performance - HVACposted by Dave Intner on Feb 8, 2010, 5:30 pm
When we look into the LEED Reference Guide for Option 1, it seems to require a... Last reply: Paul Conrad, Mar 31, 2011, 10:25 am |