Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Green Houskeeping for v2.2 & v2009

NC-2009 IDc1:Innovation in Design
posted by  Donald Green  on 

Has anyone been able to submit the same Green Housekeeping Plan for ID credit based on v2009 for a v2.2 project?

3
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Fri Oct 25, 2013, 6:46 pm

Solar Array on LEED Building - But Not Property of Building

NC-2009 EAc2:On-Site Renewable Energy
posted by  Patty Lloyd  on 

I was wondering if anyone has had experience with this, and if this scenario can earn LEED points for on-site renewable energy.

3
Director of Sustainability
Leopardo Companies, Inc.
LEEDuser Premium Member
12 thumbs up
Fri Oct 25, 2013, 4:08 pm

Conference Tables in an Open-plan Office

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Ting Wang  on 

Our project interior has two conference tables placed in an open-plan office, for team discussions and brain-storms that are casual and spontaneous.

2
Fri Oct 25, 2013, 1:45 am

Combined metering for plug loads and lighting

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Rudolph Carneiro  on 

I am having lots of trouble with design teams in getting them to seperate internal lighting circuitry from plug loads.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 24, 2013, 11:28 pm

rainwater harvesting ACP for non-healthcare/retail projects

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michael Maier  on 

The Water Use Reduction - Additional Guidance document seems to indicate that although on-site non-potable water sources for flush fixtures and/or flow fixtures (i.e.

3
Default Avatar
Leroy Street Studio
LEEDuser Basic Member
0 thumbs up
Thu Oct 24, 2013, 10:57 pm
7
Thu Oct 24, 2013, 8:54 pm

Existing Fixtures

NC-2009 WEc3:Water Use Reduction
posted by  ERIC TAYLOR  on 

Do I have to account for the water use of existing fixtures to remain on a major renovation (football stadium) under LEED NC, if they are within the LEED boundary, but the spaces/structures they ar

2
Default Avatar
Project Coordinator
Karpinski Engineering
LEEDuser Premium Member
0 thumbs up
Thu Oct 24, 2013, 8:30 pm

Who is the Commissioning Authority?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Heather Holdridge  on 

We have one firm performing fundamental Cx services and another firm performing enhanced Cx services. Which consultant would be designated the "commissioning authority?"

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Oct 24, 2013, 4:03 pm

Signatories

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Michelle Rosenberger  on 

With LEED 2009 came mandatory online signatories for Owner, CxA, Contractor, etc.

4
Architect
PF&A Design
LEEDuser Basic Member
11 thumbs up
Wed Oct 23, 2013, 11:44 pm

Innitial ?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Eric JS   on 

Dear all, In some credits, including in CxA credit, there are initial of CxA or other parties are required.

3
Architect
PF&A Design
LEEDuser Basic Member
11 thumbs up
Wed Oct 23, 2013, 11:38 pm