Topic | Recent |
---|---|
Maintenance Light on roof areaEBOM-2009 SSc8: Light Pollution Reductionposted by Ran Zhang on Nov 18, 2015, 10:43 pm
We are working on a project, whose roof is covered by equipment for most of area. For maintenance purpose, there is 1 tube installed close to the door of... |
|
How to Draw line of sight for light fixturesEBOM-2009 SSc8: Light Pollution Reductionposted by SSN Energy Model on Jul 31, 2016, 4:18 am
Hi, |
|
Existing Site Conditions altered w/in project boundaryNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Jim Pugh on Mar 13, 2017, 7:36 pm
All, We submitted a dormitory project for a university in which there was a very substantial amount of existing parking between our new building and another part of our project (a new,... |
|
Medical Equipment SpecificationHealthcare-v4 WEp2: Indoor water use reductionposted by Gabriela Crespo on Mar 14, 2017, 1:40 pm
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req. Would somebody be... |
|
Building facade facing circulation network not more than 1ftND-v4 NPDc1: Walkable Streetsposted by Kristina Pobre on Mar 14, 2017, 7:45 pm
I'm a bit confused with why LEED ND is putting a point on this specific criteria. But before that, please correct me if I understand the criteria correctly: The ground floor face of the building... |
|
ESVE RequirementPilot-Credits LTpc70: Green vehiclesposted by Joshua Chia on Mar 17, 2017, 3:43 am
Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or... |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:34 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:35 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:36 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... |
|
Public GarageNC-v4 LTc8: Green vehiclesposted by Summer Gorder on Feb 23, 2016, 8:36 pm
I am working on a public project downtown that does not have any designated parking. Could we comply by working out an arrangement with a garage in close proximity to assign preferred parking, or... |