Do I have to account for the water use of existing fixtures to remain on a major renovation (football stadium) under LEED NC, if they are within the LEED boundary, but the spaces/structures they are located in are not being touched in any manner as part of the scope of work? If yes, do I use the actual fixture flow for each existing fixture?