Log in
Forum
Topic

Tenant space without provision of HVAC system

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Wei Jiang on Mar 14, 2011, 6:32 am

For our LEED-CS project, there is no central HVAC system within the buidling. The tenant of the retail area will have to install their own equipment such as split-type A/C, fresh air fan, kitchen...

Last reply: Wei Jiang, Apr 5, 2011, 10:11 pm

Bus and Lightrail access combination?

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Scott Thayer on Apr 5, 2011, 3:02 pm

I'm working on a 100+ unit multifamily apartment project in San Jose. The site is in an area well served by transit overall (relatively central San Jose). However, there is only one bus stop...

Last reply: David Posada, Apr 5, 2011, 5:02 pm

Option 1. Simulation Question

NC-2009 IEQc8.1: Daylight and views - daylight
posted by John Drigot on Oct 14, 2009, 11:53 am

In pursuing Option 1, Simulation, you are required to run two simulations on September 21st at 9am and 3pm. What I am wondering is how I calculate the compliant space based on these two...

Last reply: Rubén M. R., Apr 5, 2011, 2:44 pm

2009 Criteria for a 2007 Project- STC rating

Schools-2009 IEQc9: Enhanced Acoustical Performance
posted by Lauren Fakhoury on Apr 4, 2011, 5:06 pm

I'm working on a LEED-S 2007 project that is pursuing this credit but I have a question about the requirements. The 2007 rating system requirement says "Also design classrooms and other core...

Last reply: Daniel Hicks, Apr 5, 2011, 12:40 pm

How to account for telecommuters

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Maria Unruh on Apr 1, 2011, 3:56 pm

This might not be the most appropriate credit category to ask this question but it does affect the calculations for this credit. Our project has 21 full time telecommuters. To account for this I...

Last reply: Maria Unruh, Apr 5, 2011, 12:19 pm

"photos with captions" requirement on PIf4

General forums
posted by Erica Downs on Apr 4, 2011, 11:42 am

Project Info Form 4 asks for uploads of building photos "with captions". Is a descriptive file name sufficient, or must the photos be inserted in a document that allows for actual captions next...

Last reply: David Posada, Apr 5, 2011, 12:11 pm

SSc1 Option 2, Path 4: Heat IE-Nonroof- Parking Stall Calc.

CI-2009 SSc1: Site Selection
posted by Michelle Bracewell-Musson on Apr 5, 2011, 10:08 am

The tenant is taking 19000 sf of a 100,000 sf existing building and making it CI. There are 60 underground parking stallas and about 200 outside (unshaded). The total number of stalls were put...

Last reply: David Posada, Apr 5, 2011, 11:40 am

South America weather data

NC-2009 EAc1: Optimize Energy Performance
posted by Carlos Alberto Hoyos Soto on Mar 25, 2011, 3:54 pm

Anyone knows what energy modeling software has developed South America weather data?

Last reply: Marcus Sheffer, Apr 5, 2011, 10:01 am

Modelling Condenser Efficieny in Baseline for LEED

NC-2009 EAc1: Optimize Energy Performance
posted by heinrich post on Mar 26, 2011, 9:05 am

We are modelling a building with water cooled chillers.
We are preparing a baseline plant for LEED NC 2009.
For the check of necessary plant efficiencies we checked the minimal...

Last reply: Marcus Sheffer, Apr 5, 2011, 10:00 am

Occupant diversity

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Rubén M. R. on Mar 17, 2011, 1:54 pm

Im working on a C&S building and we have two space types: office and meting rooms. I would like to know if I can use occupant diversity (D) for the outdoor air calculations. The ventilation...

Last reply: Roger Chang, Apr 4, 2011, 8:43 pm