The owner is signing off on the fact that a plan for corrective action WILL BE developed, but it does not clarify who develops it, nor does the plan of corrective action need to be uploaded. Outside of getting the signature and uploading an example of the survey and how the survey will be handled, am I correct in understanding that there is no other documentation required in connection to the corrective plan of action?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Ahmed Younis
Instrumentation and Control Engineer / LEED AP BD+CDar Al Handasah
6 thumbs up
June 3, 2013 - 4:11 am
dear Stantec,
the following is the only thing I saw in the study guide:
Create a written plan for corrective action if 20% or more of building occupants are dissatisfied with thermal comfort in the building (in addition to the survey ofcourse).
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
November 4, 2013 - 5:13 pm
Not all LEED requirements require documentation uploads, etc. I am not currently looking at the LEED Online form for this one, but in general, provide what's asked for, and don't worry about documenting what's not asked for (while still doing what you committed to, of course).