Fan power credit and packaged vav

NC-2009 EAp2:Minimum Energy Performance
posted by  HOUCINE TLEMSANI  on 

I am working on a project where the base line system is a packaged VAV with reheat. ASHRAE 90.1 specify the packaged efficiency as 9.8 EER including the compressor heat rejection and fans.

3
Default Avatar
Mechanical Designer
MEP Engineering Solutions, Inc
LEEDuser Basic Member
8 thumbs up
Fri Nov 1, 2013, 4:21 pm

HVAC system - Proposed model - Part of system provided

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to how to model the proposed system when only part of the system is provided for some areas. In a specific project, most of the areas have the HVAC system already desig

5
Fri Nov 1, 2013, 3:42 pm

wood with recycled content

NC-2009 MRc7:Certified Wood
posted by  Benjie Herrera  on 

If the wood purchased has 20%recycled content (which will go to MR Cr4 Recycled Content), will that mean that 80% non-recycled content of the value must be reported in the MR cr 7 Certified Wood ?

4
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Fri Nov 1, 2013, 3:29 pm

Pilot Credit vs EAc5

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  Sara Goenner Curlee  on 

I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ.

3
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Fri Nov 1, 2013, 2:27 pm

Metro Stations/Netwrok- LEED Rating

LEED Rating System Selection
posted by  Rohit Jagnani  on 

There is a Rapid Metro network in construction with multiple stations and the rail network in between. The entire network( Rail line and stations) is elevated and above the existing roads.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Nov 1, 2013, 5:48 am

RE: Wellness Room in Office Building

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Chris Miller  on 

My office project has a "Wellness" room whcih includes a lav faucet & toilet.

5
Thu Oct 31, 2013, 8:42 pm

Adjunct Professors Room

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Hi, In one of our project we have a room designated for 6 adjunct professors to work/study/rest.

4
Thu Oct 31, 2013, 4:47 pm

Wood Flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Mariah Grife  on 

I am on aproject that is installing some savage wood flooring panels that were removed and saved during demo.

4
Default Avatar
Walsh Construction
LEEDuser Basic Member
6 thumbs up
Thu Oct 31, 2013, 3:43 pm

Case 1 Central Plant Cooling

CI-2009 EAc3:Measurement and Verification
posted by  sompoche sirichote  on 

Under Case 1, we got comments from the reviewer as follows: "Case 1 - Lease The LEED Credit Form has been provided stating that the project occupies 1.2% of the base building and therefore applies

4
Thu Oct 31, 2013, 3:39 pm

M&V option D. certification timing

NC-2009 EAc5:Measurement and Verification
posted by  Alex Parella  on 

When using Option D, should we wait till the end of the 1 year monitoring to obtain the credit and, therefore, the final building certification?

4
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Wed Oct 30, 2013, 10:38 pm