Topic | Recent |
---|---|
Fixture ReplacementCI-2009 WEp1: Water Use Reductionposted by Patrick Salmon on Apr 7, 2014, 11:33 am
Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary. Based on the use of existing waterless urinals... Last reply: Carlie Bullock-Jones, Apr 7, 2014, 2:44 pm |
|
CatchNC-2009 EAc6: Green Powerposted by Jean Marais on Apr 8, 2014, 10:42 am
Are there any catches to proving that the RECs that we buy are used only on a specific LEED project? Should I ask the seller to specify the facility's name or something on the... Last reply: Jean Marais, Apr 8, 2014, 11:35 am |
|
Rater and Provider requirements?Mid-Rise-v4 IPc1: Integrative processposted by Jason Biondi on Apr 8, 2014, 12:53 pm
Are teams required to have a Rater and a Provider for Mid Rise Homes jobs? Last reply: Elizabeth Repin, Apr 26, 2018, 10:11 am |
|
Rainwater used for irrigationCS-2009 SSc6.2: Stormwater design - quality controlposted by Agnieszka Rylska on Apr 10, 2014, 7:49 am
Does reusing rainwater for irrigation complies with this credit's requirements? Does rainwater that is collected in a rainwater tank and then reused for irrigation, has to be also cleaned by... Last reply: Agnieszka Rylska, Jun 14, 2017, 7:16 am |
|
Ventilated Only Space SimulationNC-2009 EAc1: Optimize Energy Performanceposted by TOMAS URIBE on May 6, 2014, 1:42 pm
Hello Marcus! In the HVAC design of a project, there is a space where supply ventilation is included in order to accomplish the minimum amount of air required by ASHRAE 62.1-2007 standard... Last reply: Marcus Sheffer, Oct 2, 2015, 4:16 pm |
|
Design Process Load requirements?CS-2009 EAp2: Minimum Energy Performanceposted by Matt Humphreys on May 6, 2014, 5:29 pm
If a mechanical design engineer adds a note on the mechanical schedules stating "... Last reply: Marcus Sheffer, May 7, 2014, 12:16 pm |
|
Req for heating & cooling in line with baseline when not in propNC-2009 EAc1: Optimize Energy Performanceposted by Victoria Watson on May 8, 2014, 1:42 pm
Hi, I am not quite sure how to comply with Appendix G requirement to heat & Cool all conditioned/indirectly conditioned spaces and use baseline system where not designed whilst still staying... Last reply: Marcus Sheffer, Jun 3, 2014, 10:44 am |
|
Energy ModelingCI-2009 EAc1.3: Optimize energy performance - HVACposted by Charles Nepps on May 22, 2014, 9:18 am
We received a review comment back, on Energy Modeling report use to document EA cr1.3, that stated the following: "The Proposed design air cooled chiller COP for office is indicated 2.5 does not... Last reply: Marcus Sheffer, May 23, 2014, 1:12 pm |
|
Waste Audit- Averaging?EBOM-2009 MRc6: Solid waste management - waste stream auditposted by Nate Gillette on May 30, 2014, 3:22 pm
Hello: the property has been tracking recyclables since 2011 in support of their ISO14001 program. So I have monthly data going back since Jan 2011. A 24-hour period does not make sense to them... Last reply: Nate Gillette, Jun 6, 2014, 7:29 pm |
|
Green cleaning products- Saudi ArabiaEBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materialsposted by Rosemary Chisholm on Jun 1, 2014, 9:46 am
Hi there! I am having a really hard time implementing a green cleaning program for existing buildings to comply with the Purchasing of Sustainable Cleaning Products and Materials. Currently we... Last reply: Trista Brown, Jun 30, 2016, 12:06 pm |