MERV 13 requirement in tall buildings

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Bilge Ceylan  on 

I am working on a CI project which is in a tall building.

2
Wed Dec 11, 2013, 4:40 pm

LEED for Homes (International)

LEED for Homes (LEED-H) Forum
posted by  Maya Karkour  on 

Dear Sirs, I Was wondering whether the LEED for Homes scheme is now available for international projects.

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Dec 11, 2013, 4:22 pm

Doubt related with calculation procedure

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Ricardo Sá  on 

I have some doubts related with this credit in a specific project with the following characteristics: - The majority of the site area collect run-off water to one lake installed on-site, and also

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Wed Dec 11, 2013, 1:20 pm

Offsite Renewable Energy

NC-2009 EAc1:Optimize Energy Performance
posted by  Dave Hubka  on 

Our project will have a biofuel system that utilizes agricultural crops as the biofuel. Per the LEED reference guide this is considered to be renewable energy.

5
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Dec 10, 2013, 7:41 pm

3 phase project - when do I need to procure Green Power?

NC-2009 EAc6:Green power
posted by  Ted Vanderlinden  on 

We've evaluated energy consumption during design phase and are working with the owner to determine who we will be purchase credits from. Question is really timing.

7
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Dec 10, 2013, 5:04 pm

airflow control in a reference building

CS-2009 EAp2:Minimum Energy Performance
posted by  Agnieszka Rylska  on 

In our proposed building we have CAV ventilation system which at night (when there's noone in the building) will provide 50% of the designe airflow rates.

3
Tue Dec 10, 2013, 4:40 pm

Can I register a Mock or Dummy Project for training purposes?

General forums
posted by  John Smith  on 

I wish to pay the fee and register with LEEDonline (v3) a project about a real building that is to be designed and constructed, but the owner is not interested in obtaining any LEED certification.

8
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Mon Dec 9, 2013, 5:29 pm

Occupant Survey Form

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Aurélie Kazour  on 

Hello. I am preparing to conduct the occupant comfort survey in a hospital. I am not sure if the below form is valid: /// Survey form based on: LEED for Existing Buildings: Operations & Mainte

2
Mon Dec 9, 2013, 11:16 am

DOAS units

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Mike oliva  on 

I need some clarification on what definition of a "ventilation system" would be with respect to design that uses a DOAS unit that provides outdoor air to each space.

4
Fri Dec 6, 2013, 10:56 pm

Interior renovation

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Erin Holdenried  on 

We are working on an interior rennovation of a multi-level office building with one owner/tenant. We are not touching the core, shell or landscape.

3
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Fri Dec 6, 2013, 9:55 pm