Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Warehouse Lighting -- Again

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Steve Samenski  on 

I've reviewed the threads on here and I see that warehouse lighting is discussed frequently.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 13, 2013, 10:52 pm

Definiition of building entrance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Nate Maniktala  on 

What is the definition of 'building entrance'? If a canopy extends out 150ft from the actual door, can we could the canopy length? Or does the actual door dictate the distance? Thanks!

3
Fri Dec 13, 2013, 7:10 pm

LTc1. possible 18 points

CI-v4 LTc1:LEED for neighborhood development location
posted by  FRAGKISKOS LEVANTIS  on 

I do understand the logic behind giving a possible 18 points when locating in a LEED ND project. However, international projects, i.e.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Dec 13, 2013, 7:04 pm
7
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Dec 12, 2013, 10:46 pm

High Rise Residential - smoke detector/CO2 mon. combined device?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Abena Darden  on 

Hi All -- I see my question might already be partially answered in the conversation from May 28, 2013.

11
Director of Operations
WorkingBuildings, LLC
LEEDuser Expert
39 thumbs up
Thu Dec 12, 2013, 6:37 pm

Campus DES Cx - LEED Submittal Requirements

NC-2009 EAc3:Enhanced Commissioning
posted by  Everardo Ocampo  on 

I'm working on a project at a Campus where an existing DES is being retro-commissioned. The DES will serve a new LEED building that is attempting to attain EA c3 (Enhanced Cx).

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Dec 12, 2013, 5:16 pm

Sound absorption coefficient data

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Monica Alicea  on 

Hello, We are working on filling out the Sound Absorption coefficient data in Table IEQp3-3.

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Thu Dec 12, 2013, 2:51 pm

double charged?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jean Marais  on 

I'm appealing WEp1. We built in extra water saving measures. It seems that leedonline wants to charge me to update WEc3. Surely that is not fair.

4
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Dec 12, 2013, 2:23 pm

Naturally ventilated offices- mild temperate climate-loads unmet

NC-2009 EAp2:Minimum Energy Performance
posted by  Paul Overy  on 

We have a narrow plan 3 storey naturally ventilated building with radiators (baseboard) in temperate Ireland. Some windows are user controlled and some controlled by the BMS, with night purge.

5
Default Avatar
Overy+Associates
LEEDuser Basic Member
0 thumbs up
Wed Dec 11, 2013, 6:16 pm

Receptacle equipment in a Core&shell office building

CS-2009 EAp2:Minimum Energy Performance
posted by  Eleftherios Zacharakis  on 

When using Table G-C in User's Manual for ASHRAE Standard 90.1-2010 to define the receptacle equipment power density in an office building, shall I assume that even the Servers power density is inc

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Dec 11, 2013, 5:08 pm