Topic | Recent |
---|---|
Existing refueling stationNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Maura Adams on Feb 9, 2011, 11:12 am
We have a refueling station on our campus from a previous LEED project. It's about 1/4 mile from the new building and there's a walking path between the two parking areas. Do you think this would... Last reply: Susan Walter, May 18, 2011, 5:47 pm |
|
Donation of existing furnitureNC-2009 MRc2: Construction Waste Managementposted by Ron Frank on Sep 22, 2010, 12:37 am
We donated from our project in San Francisco a lot of used furniture to schools and Fire Department that avoided going to Land Fill sites. Can we utilize this against percentage for MRc2 for... Last reply: Renee Shirey, May 18, 2011, 5:01 pm |
|
MPR 2NC-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on May 5, 2011, 10:23 pm
According to MPR 2, buildings should be constructed on already existing land. On the supplemental guide it states that cantilevered buildings over water, highways, etc, are acceptable. So it is... Last reply: javier bolanos zeledon, May 18, 2011, 12:55 pm |
|
Documentation requirements?Schools-2009 IEQp1: Minimum indoor air quality performanceposted by Tommy Linstroth on May 28, 2010, 10:08 amBadger LEEDuser Expert 126 thumbs up May 18, 2011- 11:07 am We contacted GBCI and their help forum said we could submit our own spreadsheets. We did so in our design review response (after they initially... Last reply: Tommy Linstroth, May 18, 2011, 11:07 am |
|
Permanent entryway walk-off systems at least 10 feet longSchools-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Gendel Metlitsky on May 18, 2011, 7:58 am
Q #1: We are working on design of 10-story school in downtown of the major US city. Design calls for roof play yard. Do we need to apply 10 feet rule for re-entry doors leading to elevator lobby... Last reply: Allison Beer McKenzie, May 18, 2011, 8:37 am |
|
Bed FormattingGeneral forumsposted by Jason Chenard, PE on May 17, 2011, 11:25 am
Sorry for the bad formatting. It did not show on the preview, and I can not edit after submission, apparently. Blame MS Word. -Jason Last reply: David Posada, May 17, 2011, 5:51 pm |
|
Off Site ParkingCI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Jeff Mosher on May 17, 2011, 5:07 pm
Can one acheive this credit via compliance path B. (no parking) if the facility has no on-site parking, but does have an off-site parking lot with a shuttle service? They are in reality... Last reply: David Posada, May 17, 2011, 5:28 pm |
|
We attempted this pilotPilot-Credits PC9: Street Networkposted by Terry Gorski on Dec 13, 2010, 12:51 pmof this forum.. Others with location & planning experience have opinions on this? Log in or register to post comments Jon Texter President Essex General Construction, Inc. LEEDuser Basic Member 71 thumbs up May... Last reply: Jon Texter, May 17, 2011, 2:08 pm |
|
Uplights under cover / underwaterNC-2009 SSc8: Light Pollution Reductionposted by Francis Porter on May 17, 2011, 2:19 am
Hello All, Are exterior uplights exempt from the 90 degrees above nadir categorisation if they are under cover of a shading... |
|
2010 SF Reduced Risk Pesticde ListEBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest managementposted by Andy Rhoades on Sep 14, 2010, 3:00 pm
Our project is using a pesticide that is found on the 2010 SF Reduced Risk Pesticide List but not on the 2007. The reference guide states that the 2007 list should be used. Is it safe to assume... Last reply: Jason Franken, May 16, 2011, 6:02 pm |