EAc2.1 workEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Elizabeth Crenshaw Hammitt on Nov 2, 2012, 9:48 am
From reading these comments, it seems like any work done EAc2.1 MAY NOT count toward this credit. Activities that were done for EAc2.1 would have to be repeated, making EAc2.1 a baseline case...... Last reply: Eric Anderson, Feb 8, 2013, 5:35 pm |
|
Multiple Buildings but Really One ProjectNC-2009 PIf1: Minimum Program Requirementsposted by Erica Timmons on Nov 5, 2012, 2:03 pm
We are working on a university campus. Our projects include TWO groups, of 3-4 physically unconnected, but almost identical buildings in terms of layout and function that are relatively side by... Last reply: Deborah Lucking, Feb 25, 2014, 1:01 pm |
|
Lighting density in Shopping Centre mall areasCS-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Nov 8, 2012, 2:29 pm
According to ASHRAE 90.1, power allowance for lighting in mall areas is 18 W/m2 (table 9.6.1). Last reply: Ricardo Sá, Nov 13, 2012, 10:31 am |
|
choosing the CxA for Enhanced CommissioningNC-2009 EAc3: Enhanced Commissioningposted by Marina Andrade on Nov 12, 2012, 8:03 am
A project we are working on already has a... Last reply: Scott Bowman, Nov 30, 2012, 4:53 pm |
|
Home ScrapNC-2009 MRc4: Recycled Contentposted by Stantec IP - Dupe - Do not use on Nov 14, 2012, 11:41 am
I have a letter from a supplier claiming 58%... Last reply: Nadav Malin, Nov 17, 2012, 8:51 am |
|
IEQP1_Minimum Indoor Air Quality templateNC-2009 IEQp1: Minimum indoor air quality performanceposted by susan eguia on Nov 15, 2012, 2:42 pm
Hi, I'm trying to fill-out the above form. I checked all the calculations for each fields. However, i can always get warning sign of " Would need over 100% OA Intake". Our project does... Last reply: Dylan Connelly, Dec 4, 2012, 12:10 pm |
|
Terrazzo Sealer QuestionNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Todd Bundren on Nov 16, 2012, 1:12 pm
What is the... Last reply: Susan Walter, Nov 30, 2012, 4:45 pm |
|
completing VRP table for mixed mode ventilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Tom O'Neil on Nov 18, 2012, 1:14 pm
I have a wine tasting room space that utilizes mechanical ventilation (with ERV units) for most of the year. In spring and fall weekend use, the occupant load increases and natural ventilation... Last reply: Tom O'Neil, Feb 12, 2013, 9:05 am |
|
what can be included in LEED project boundary?Healthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Adam Targowski on Nov 20, 2012, 8:38 am
The owner has a land which is divided into 3 parts. One part (A) will consist of a buidling which the owner wants to certify, second part (B) will consist of a park.The problem is with the third... Last reply: Kimberly Frith, Jan 8, 2013, 8:04 am |
|
SSp2Schools-2009 SSp2: Environmental Site Assessmentposted by Mike Walker on Nov 20, 2012, 12:54 pm
Can a Phase I be eliminated by moving directly to a Phase II assessment? Last reply: Larry Sims, Nov 20, 2012, 4:17 pm |