Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

IEQ 8.2 a prerequisite for IEQ 8.1 in LEED NC 2009?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Olivier Brouard  on 

Greetings everyone, and Merry Christmas. I've been interested by the subject in the header, as I have in the past on a project under LEED Healthcare category, in which IEQ 8.2 Views was a prerequi

4
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Dec 30, 2013, 9:52 pm

Can A Project refer to more than one LEED AP BD+C for IDcredit 2

NC-2009 IDc2:LEED Accredited Professional
posted by  James Keohane  on 

Can a project refer to one LEED AP for the Design Review Submission and another LEED AP for the Construction Review Submission? How would we document this?

2
AIA, LEED Fellow
ChicagoGreen
LEEDuser Basic Member
3 thumbs up
Mon Dec 30, 2013, 6:33 pm

ID Credit in NC: Green Cleaning Policy

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Luciana T.  on 

We are pursuing an ID credit for LEED certification under New Construction.

3
Fri Dec 27, 2013, 7:30 pm

Flush out and data center

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Lise Dannesboe  on 

We are pursuing option 1 Flush Out. Our building includes a large datacenter.

6
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Fri Dec 27, 2013, 3:54 pm

Spaces not in Matrix - Vending, Recycling, and janitor's closets

General forums
posted by  Lyle Axelarris  on 

Three questions here: -What space type should I use for a vending room (enclosed room with vending machines)? -What space type should I use for a small enclosed room for recycling containers? -What

6
Fri Dec 27, 2013, 1:21 am

Flush out in a Warehouse

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Paula Hernandez  on 

Hello to everyboty and Merry Christmas, I have to make the flush out in a building which is mostly a Warehouse, that will be regularly occupied, with mechanical ventilation but no air conditioning.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 26, 2013, 5:52 pm

Run-off calculations for a site with future extensions

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Valentin Grimaud  on 

Dear community, We certify a project that will have two extensions in the future. Because of this we cannot earn crédits SSc5.1 and SSc5.2 as per the MPR.

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Dec 26, 2013, 4:33 pm

IEQ Ductwork Protection

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jennifer Kissinger  on 

Should the ductwork that is delivered to the jobsite for installation be wrapped at the fab shop on both ends or can the ends of the duct be wrapped onsite prior to unloading from the truck?

2
Thu Dec 26, 2013, 3:28 pm

Tenant area with prescribed HVAC system in a CS project

CS-2009 EAp2:Minimum Energy Performance
posted by  farhana imran  on 

Dear Expert, In our CS project the owner wants to limit the tenants to a specific HVAC system with under floor air distribution.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 26, 2013, 2:38 pm

FTE Calculation for 3 shifts?

Calculating FTEs
posted by  Nicole Kimoto  on 

I have a building that has 2 floors, each with 3 FT shifts, but with different personnel counts.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Dec 24, 2013, 7:54 pm