Forum quick links
IEQ 8.2 a prerequisite for IEQ 8.1 in LEED NC 2009?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Olivier Brouard on
Greetings everyone, and Merry Christmas. I've been interested by the subject in the header, as I have in the past on a project under LEED Healthcare category, in which IEQ 8.2 Views was a prerequi
Can A Project refer to more than one LEED AP BD+C for IDcredit 2
NC-2009 IDc2:LEED Accredited Professionalposted by James Keohane on
Can a project refer to one LEED AP for the Design Review Submission and another LEED AP for the Construction Review Submission? How would we document this?
ID Credit in NC: Green Cleaning Policy
EBOM-2009 IEQp3:Green Cleaning Policyposted by Luciana T. on
We are pursuing an ID credit for LEED certification under New Construction.
Flush out and data center
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lise Dannesboe on
We are pursuing option 1 Flush Out. Our building includes a large datacenter.
Spaces not in Matrix - Vending, Recycling, and janitor's closets
posted by Lyle Axelarris on
Three questions here: -What space type should I use for a vending room (enclosed room with vending machines)? -What space type should I use for a small enclosed room for recycling containers? -What
Flush out in a Warehouse
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Paula Hernandez on
Hello to everyboty and Merry Christmas, I have to make the flush out in a building which is mostly a Warehouse, that will be regularly occupied, with mechanical ventilation but no air conditioning.
Run-off calculations for a site with future extensions
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Valentin Grimaud on
Dear community, We certify a project that will have two extensions in the future. Because of this we cannot earn crédits SSc5.1 and SSc5.2 as per the MPR.
IEQ Ductwork Protection
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jennifer Kissinger on
Should the ductwork that is delivered to the jobsite for installation be wrapped at the fab shop on both ends or can the ends of the duct be wrapped onsite prior to unloading from the truck?
Tenant area with prescribed HVAC system in a CS project
CS-2009 EAp2:Minimum Energy Performanceposted by farhana imran on
Dear Expert, In our CS project the owner wants to limit the tenants to a specific HVAC system with under floor air distribution.
FTE Calculation for 3 shifts?
posted by Nicole Kimoto on
I have a building that has 2 floors, each with 3 FT shifts, but with different personnel counts.