Forum quick links
Food service building in Colombia - FTE's
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Edgar Rodriguez on
We are starting a project (food service building) taht will serve to the users of other individual buildings of the same company, all of them are within the propoerty of the company and are not LEE
Does anyone have experience with LI 10296?
NC-2009 MRc7:Certified Woodposted by Tiffany Moore on
I just got review comments back that refer to this LI.
Lime powder or cement to improve soil.
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Michael E. Edmonds-Bauer on
A contractors asked us about lime powder or cement and soil contamination. The contractor would like to scratch the soils surface then spread lime powder or cement, this is for the soil to be impr
Bus Frequency
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Sean Hogan on
Our office/labs/pilot plant project will provide a compliant bus stop at the site entrance and a local bus company has agreed to divert an existing bus route which connects the town's rail station,
Is it really the windows?
posted by Francis Chua on
Dennis: I have experienced weak cell phone signal in a brand new 4-story 180-bed long term care facility. But I'm not sure if it is due to the low-e glazing.
How to calculate Raw Material distance for Option 2?
NC-2009 MRc5:Regional Materialsposted by Charles Clark Jr on
I am still confused about how to calculate the raw material distance for Option 2. I understand how to calculate the distance from the manufacturing facility to the job site.
Tinted Glass Material Threat Factor
Pilot-Credits SSpc55:Bird collision deterrenceposted by Sara Goenner Curlee on
When I review the Material Threat Factors for the different glazing options, I do not see tinted glass listed anywhere. Am I blind? Or am is it considered the same as clear glass?
Louvers on Solid Surface
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a case of Southern aluminum louvers that do cover the entire wall, and I'am modelling the basecase without these louvers.
LEEDs Clarification
NC-2009 MRc5:Regional Materialsposted by Jessica Sarfaty on
Hello, Can you please clarify what regional manufacture % by weight, and Harvest/ Extraction % by weight is?
Can a shell be LEED Core and Shell certified without HVAC?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Lawrence Lile on
We are working on a project with two stages. The first stage is a shell building, the second stage is a tenant finish-out. The HVAC system is part of the tenant finish-out stage.