Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Food service building in Colombia - FTE's

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Edgar Rodriguez  on 

We are starting a project (food service building) taht will serve to the users of other individual buildings of the same company, all of them are within the propoerty of the company and are not LEE

2
Tue Jan 7, 2014, 5:23 pm

Does anyone have experience with LI 10296?

NC-2009 MRc7:Certified Wood
posted by  Tiffany Moore  on 

I just got review comments back that refer to this LI.

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Tue Jan 7, 2014, 2:53 pm

Lime powder or cement to improve soil.

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael E. Edmonds-Bauer  on 

A contractors asked us about lime powder or cement and soil contamination. The contractor would like to scratch the soils surface then spread lime powder or cement, this is for the soil to be impr

3
Mon Jan 6, 2014, 8:43 pm

Bus Frequency

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sean Hogan  on 

Our office/labs/pilot plant project will provide a compliant bus stop at the site entrance and a local bus company has agreed to divert an existing bus route which connects the town's rail station,

8
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Mon Jan 6, 2014, 7:28 pm

Is it really the windows?

General forums
posted by  Francis Chua  on 

Dennis: I have experienced weak cell phone signal in a brand new 4-story 180-bed long term care facility. But I'm not sure if it is due to the low-e glazing.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Jan 6, 2014, 6:27 pm

How to calculate Raw Material distance for Option 2?

NC-2009 MRc5:Regional Materials
posted by  Charles Clark Jr  on 

I am still confused about how to calculate the raw material distance for Option 2. I understand how to calculate the distance from the manufacturing facility to the job site.

3
Mon Jan 6, 2014, 5:48 pm

Tinted Glass Material Threat Factor

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Sara Goenner Curlee  on 

When I review the Material Threat Factors for the different glazing options, I do not see tinted glass listed anywhere. Am I blind? Or am is it considered the same as clear glass?

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Mon Jan 6, 2014, 5:14 pm

Louvers on Solid Surface

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I have a case of Southern aluminum louvers that do cover the entire wall, and I'am modelling the basecase without these louvers.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jan 6, 2014, 4:16 pm

LEEDs Clarification

NC-2009 MRc5:Regional Materials
posted by  Jessica Sarfaty  on 

Hello, Can you please clarify what regional manufacture % by weight, and Harvest/ Extraction % by weight is?

3
Mon Jan 6, 2014, 3:56 pm

Can a shell be LEED Core and Shell certified without HVAC?

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Lawrence Lile  on 

We are working on a project with two stages. The first stage is a shell building, the second stage is a tenant finish-out. The HVAC system is part of the tenant finish-out stage.

5
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Jan 6, 2014, 3:28 pm