Topic | Recent |
---|---|
Water Closet BaselineCI-2009 WEp1: Water Use Reductionposted by Brandon Dark on May 12, 2011, 12:48 pm
Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building. The restrooms in this building prior to construction had 3.5 gpf blow-out... Last reply: Tristan Roberts, May 25, 2011, 9:16 pm |
|
VOC TestingNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Maya Karkour on May 6, 2011, 11:20 am
Hello, Do you guys know if the... Last reply: Nadav Malin, May 25, 2011, 7:19 pm |
|
Can a PC count for Campus?Pilot-Credits PC41: Wastewater Managementposted by Prudence Ferreira on May 24, 2011, 7:03 pm
If we were to certify a campus... Last reply: Batya Metalitz, May 25, 2011, 12:59 pm |
|
100% of energy generated by PVs at site--will it earn 19 points?NC-2009 EAc1: Optimize Energy Performanceposted by Brooks Critchfield on May 18, 2011, 9:51 am
We have a project on a "campus" site with existing buildings. The Owner has installed an extensive array of PVs which are shared by buildings on this site. The array is extensive enough to... Last reply: Brooks Critchfield, May 25, 2011, 12:03 pm |
|
questions of Install Drift Eliminators and minimum efficienciesPilot-Credits WEpc17: Cooling tower water useposted by Jie Zhang on Apr 1, 2011, 3:09 am
In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system... Last reply: Batya Metalitz, May 25, 2011, 11:57 am |
|
Vertical Fc at property lineNC-2009 SSc8: Light Pollution Reductionposted by JOSH FISHER on May 25, 2011, 11:14 am
What is the height off the ground at which the vertical Fc are are to measured at the property line? |
|
Tracking compacted trash and loose recyclablesEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Kristen Salinas on May 4, 2011, 6:22 pm
My project is having problems tracking their trash and recyclables by volume. The trash is compacted 4:1 in a trash compactor. This trash remains in its compacted state even when it is in the... Last reply: Dan Ackerstein, May 25, 2011, 10:00 am |
|
Problems with LEED EAp2 form table EAp2-4?CS-2009 EAp2: Minimum Energy Performanceposted by Leticia SooHoo on Aug 11, 2010, 3:46 pm
Hi there, I am in the process of filling out the LEED EAp2 form for a LEED-NC project. On page 7, table EAp2-4, when I input the numbers from my Energy model (EnergyPro, UTIL-1) into the... Last reply: Yu Wang, May 25, 2011, 9:21 am |
|
Automatic for a LEED CS certified building?CI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Patrick Moore on May 25, 2010, 5:03 pm
It states above, "Projects located within a LEED-certified building that achieved this credit in another rating system (for example LEED-NC SSc4.4) automatically earn the credit based on existing... Last reply: Grace Ming, May 25, 2011, 12:55 am |
|
contact GBCIGeneral forumsposted by Tristan Roberts on May 25, 2011, 12:03 am
Is this for LEED registration or certification via LEED Online? Please use the "feedback" link on LEEDOnline.com to contact... Last reply: Puteri Shireen Jahnkassim, May 25, 2011, 12:37 am |