BAS Lighting Controls

EBOM-2009 EAc3.1: Performance measurement - building automation system
posted by Nell Boyle on Jun 14, 2010, 2:04 pm

What level of lighting controls are acceptable for LEED? Do a certain percent of building lights have to be controlled by the BAS or is there some other measure? Maybe this requirement could be...

Last reply: Kimberly Frith, Mar 31, 2011, 2:32 pm

Must have VAV system for Option 1?

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Dave Intner on Feb 8, 2010, 5:30 pm

When we look into the LEED Reference Guide for Option 1, it seems to require a...

Last reply: Paul Conrad, Mar 31, 2011, 10:25 am

Enhanced CX 'Design Firm'

NC-2009 EAc3: Enhanced Commissioning
posted by Julianne Laue on Feb 18, 2011, 12:03 pm

If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX?

Last reply: Keith Steurer, Mar 30, 2011, 4:20 pm

STC ratings for ceiling and floors?

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Tyler Barter on Mar 30, 2011, 9:16 am

hi,
We are using LEED for Schools 2007 and am looking for some information on where to find...

Last reply: Daniel Hicks, Mar 30, 2011, 3:20 pm

Use CO2 Measurement to meet Prereq Requirement

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Eric Tu on Mar 29, 2011, 2:55 pm

Hello;

Out BAS does not measure air flow (CFM), but, it does measure Return Air and OA C02 values.

Can this PreReq be met using...

Last reply: David Hubka, Mar 30, 2011, 1:51 pm

Separate Trash & Recycling Audits

EBOM-2009 MRc6: Solid waste management - waste stream audit
posted by Alexis Thompson on Mar 30, 2011, 1:31 pm

If a project has 2 separate haulers (one for trash, and one for recycling), then is it necessary to conduct both audits at the same time? Will the credit be denied/pending if the trash audit was...

Last reply: Jason Franken, Mar 30, 2011, 1:50 pm

Bike storage for residents with disabilities?

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Stefania Minotti on Mar 22, 2011, 9:53 am

I’m presently working on a mid-rise residential social housing building with 5 stories and 76 units. 67 of these apartments are 1 bedroom and 9 are two bedroom. According to the guide I need to...

Last reply: Jonathan Weiss, Mar 30, 2011, 1:25 pm

Sampling

Pilot-Credits PC36: Compartmentalization
posted by Aaron Gary on Mar 29, 2011, 7:07 pm

If a multifamily project (based on Green Rater/Builder experience) is approved for sampling by the USGBC will sampling be allowable for achieving this credit as well or will every unit have to be...

Last reply: Asa Foss, Mar 30, 2011, 9:30 am

Items to be implemented for EAc2.2

EBOM-2009 EAc2.2: Existing building commissioning - implementation
posted by Mark Campbell on Mar 22, 2011, 12:29 pm

It is clear that the low cost/no cost items uncovered during the investigation phase in EAc2.1 must ALL be implemented to satisfy the requirements of EAc2.2.

My Question: Must ALL of the...

Last reply: David Hubka, Mar 30, 2011, 7:36 am

Space Summary- Table EAp2-1 Space Usage Type?

Schools-2009 EAp2: Minimum Energy Performance
posted by Renee Shirey on Mar 29, 2011, 5:56 pm

In this Table, are we supposed to list EVERY room in the building, or group similar rooms to together? This table seems a lot like what is in PI f3 (Table PI f3 Space Usage Type) - but that one...

Last reply: Marcus Sheffer, Mar 29, 2011, 6:07 pm