Log in
Forum
Topic

Phase II

Schools-2009 SSp2: Environmental Site Assessment
posted by Terry Squyres on Feb 7, 2011, 9:38 am

If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?

Last reply: Donald Kaylor, Apr 14, 2011, 11:42 am

Artificial Turf

NC-2009 SSc5.2: Site development - maximize open space
posted by Katrina Rosa on Apr 13, 2011, 7:49 pm

For a mixed-use project (1st story commercial, top 7 multi-family residential), in an urban setting (achieves Community Connectivity SSc2): can artificial turf on the roof deck contribute to...

Last reply: Tristan Roberts, Apr 14, 2011, 8:36 am

Dance studio views

NC-2009 IEQc8.2: Daylight and views - views
posted by Norma Lehman on Mar 17, 2011, 11:03 am

this dance studio has windows that provide a "connection between indoor spaces and outdoors" with views to the sky. At the dance floor and the first tier of seating, the window height is above...

Last reply: Carlie Bullock-Jones, Apr 14, 2011, 8:32 am

pilot credits- we need your help!

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by brendan owens on Aug 20, 2010, 10:45 am

Hi LEEDusers -

The idea behind pilot credits is to get feedback from project team members on the concepts we're testing so that USGBC can learn from your experience and make these credits...

Last reply: Lorenzo Bersanetti, Apr 14, 2011, 6:54 am

parking garage

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Lisa Marshall on Mar 10, 2010, 5:17 pm

I have a project where I have an existing parking garage on a campus that has PV's on the roof. This parking garage is not part of our LEED site boundary, can I still earn SSc7.1?

Last reply: Lorenzo Bersanetti, Apr 14, 2011, 6:42 am

Maps

Pilot-Credits PC14: Walkable Streets
posted by Jacki Craig on Apr 12, 2011, 6:17 pm

The credit asks for multiple types of map to show different site requirements. Is it acceptable to include all necessary info on one map, or do they have to be broken down like they are under the...

Last reply: Chris Marshall, Apr 13, 2011, 4:28 pm

On-Street Parking

Pilot-Credits PC14: Walkable Streets
posted by Carly Ruggieri on Apr 12, 2011, 11:11 am

Can projects use on-street parking that has time limitations (e.g. Parking is prohibited from 8am-6pm on Weekdays)? Since parking is technically allowed, just not at all times, can this still...

Last reply: Chris Marshall, Apr 13, 2011, 4:21 pm

Excluding Casework from IEQc8.1 & IEQc8.2

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by John Drigot on Apr 12, 2011, 1:05 pm

On a previous LEED for Schools 2009 project I was sucessful in not including the space occupied by built-in casework in the occupied square footage of a space. I am on another LEED project and...

Last reply: John Drigot, Apr 13, 2011, 12:22 pm

GIB Credit 7 Minimize Site Disturbance

General forums
posted by Peter Doo on Feb 27, 2011, 4:30 pm

Project site includes upen space that is undeveloped but previously "disturbed" in that it is a turf field (no trees or native plants). Developer proposes to build on this land. How do we...

Last reply: Michelle Robinson Schwarting, Apr 13, 2011, 11:24 am

Certification Requirement

General forums
posted by Peter Doo on Mar 17, 2011, 2:35 pm

The Reference Guide states that the final step to certification occurs when "certificates of occupancy for buildings...have been issued..." Does this mean that 100% of the buildings must be...

Last reply: Michelle Robinson Schwarting, Apr 13, 2011, 11:12 am