Topic | Recent |
---|---|
Servers and other network equipmentCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Dax Ponce de Leon on Apr 14, 2010, 12:36 pm
Do you have any guidance on how to treat servers and other network equipment? From what I can tell, the EPA introduced the ENERGY STAR for servers in 2009, but few units have been rated thus far... Last reply: Tristan Roberts, Oct 29, 2010, 3:02 pm |
|
Gypsum Board Joint CompoundSchools-2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealantsposted by Alison Y Rivenburgh on Apr 14, 2010, 12:36 pm
How should a ready mixed drywall joint compound be treated for the purposed of EQc4.1 and/or EQc4.2? Is it classified as an Architectural Sealant by... Last reply: Summer Minchew, Aug 4, 2022, 1:56 pm |
|
ASHRAE Compliance FormsCI-2009 EAp2: Minimum Energy Performanceposted by Jose Salinas on Apr 19, 2010, 9:49 am
Hi, my question is as follows: in version 2.2 when you chose to use the complience forms to support the mandatory provisions, only the check list part was necessary to be filled up. Since the V 3... Last reply: Paul Conrad, May 27, 2010, 8:45 am |
|
Calculating FTEsCalculating FTEsposted by Amy Calvanese on Apr 19, 2010, 5:20 pm
I understand if a transient is coming one hour per day like the example above, but what if they are only coming once a week and working 8 hours? How is that calculated? And does two... Last reply: Tristan Roberts, Aug 20, 2010, 1:37 am |
|
Homemade Cleaning ProductsEBOM-2009 IEQc3.3: Green cleaning - purchase of sustainable cleaning products and materialsposted by April Ambrose on Apr 19, 2010, 5:32 pm
Can anyone offer any guidance on how to assess whether or not homemade cleaning products can comply? For instance, in a building where all cleaning products are chemical-free and made from... Last reply: Martha Norbeck, Nov 20, 2013, 3:47 pm |
|
Is SS c7.2 actually a Construction Credit?NC-2009 SSc7.2: Heat island effect - roofposted by Kim Shinn on Apr 22, 2010, 5:56 pm
During design review, request for additional information on actual installed materials. I upload the specification section showing requirement for... Last reply: Susann Geithner, Aug 23, 2011, 9:51 am |
|
Variable Flow ShowerheadsNC-2009 WEp1: Water Use Reductionposted by April Ambrose on Apr 23, 2010, 4:48 pm
How do you enter a variable flow shower head in the template? The American Standard flowise 3 function showerhead is a great example: 3 spray settings: Last reply: April Ambrose, Dec 19, 2011, 4:44 pm |
|
Is it a roof-1?NC-2009 SSc7.2: Heat island effect - roofposted by on Apr 29, 2010, 6:33 pm
We have a paved walking surface (concrete pavers-low... Last reply: Raphael Sperry , Oct 11, 2011, 4:30 pm |
|
Private BalconiesNC-2009 SSc5.2: Site development - maximize open spaceposted by Maya Karkour on May 4, 2010, 9:50 am
Hi all, We are performing a LEED 2009 NC assessment for a 42-story high rise residential building. Each apartment has several balconies. Can we consider all these private balconies to be "... Last reply: Susann Geithner, Mar 9, 2011, 11:08 am |
|
Case 2 seems a doddleNC-2009 SSc6.1: Stormwater design - quantity controlposted by Jean Marais on May 7, 2010, 5:54 am
Here, by the looks of it, no RATE calculations are required. Just VOLUME...and only for the 2-year 24hr design storm to boot, meaning: 1) Get the total volume ("Depth") of the 2-... Last reply: Gustavo De las Heras Izquierdo, Jun 26, 2015, 2:37 pm |