Topic | Recent |
---|---|
Humidification in AHUsNC-2009 EAp2: Minimum Energy Performanceposted by Davide Liviero on Nov 10, 2020, 5:38 am
Dear all, I am modelling a hospital which has humidification within the AHUs. The required steam is produced using natural gas, which means I need an Exceptional Calculation because the... Last reply: Marcus Sheffer, Nov 11, 2020, 7:44 pm |
|
"ready for review" status in Design Final Review DecisionCS-2009 IDc2: LEED Accredited Professionalposted by sofia la cognata on Nov 10, 2020, 6:17 am
Good Morning, we have submitted this credit in the design review, but in the Design Final Review Decision the status is "ready for review" and not "anticipated" like the others. Can you... Last reply: Gloria Rozzini, Oct 29, 2021, 11:00 am |
|
Warehouse ventilation filtration systemWarehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Gabriela Mena on Nov 24, 2020, 1:53 pm
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced... Last reply: Dave Hubka, Mar 11, 2023, 11:12 pm |
|
Fan Powered Terminal Unit MERV-13 FiltrationNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Leslie Paras on Dec 2, 2020, 2:24 pm
Is the recirculated air delivered by a Fan Powered Terminal Unit required to be filtered by a... Last reply: Karen Joslin, Jul 23, 2021, 12:48 pm |
|
Demand Controlled VentilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Nancy Henderson on Dec 15, 2020, 7:05 pm
We have demand controlled ventilation in spaces with varying occupancy. The building is a YMCA. The controls contractor set the... Last reply: Nancy Henderson, Dec 16, 2020, 5:19 pm |
|
Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?NC-v4.1 WEc2: Indoor water use reductionposted by Catherine Blakemore on Dec 18, 2020, 12:07 pm
I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form. There are no fixture options for for the following fixtures: 1) Exam Room sinks or... Last reply: emily reese moody, Feb 2, 2023, 12:13 pm |
|
Covered Parking vs. Undercover ParkingNC-v4 SSc5: Heat Island Reductionposted by Bob Adedayo on Dec 29, 2020, 1:01 pm
Hello, I am studying for my LEED Green Associate exam, and I have found two conflicting terminologies regarding an area where yo can store vehicles in a building. Is the correct terminology "... Last reply: Bob Adedayo, Jan 9, 2021, 4:30 pm |
|
Purchasing off-site Renewable EnergyCI-v4 EAp2: Minimum Energy Performanceposted by Bob Adedayo on Dec 29, 2020, 5:02 pm
Hi, I have two conflicting information as to whether or not off-site renewable eneregy can be purchased from out of State. Could you please clarify is it must be purchased in-state or if... Last reply: Bob Adedayo, Jan 9, 2021, 5:44 pm |
|
ACP for Industrial FacilityWarehouses-NC-v4 LTc4: Surrounding density and diverse usesposted by Jill Kurtz on Jan 18, 2021, 12:27 am
I am certifying an industrial manufacuting facility. We didn't think we would qualify as warehouse or distribution given our high eneryg use, but our facility type is much more akin to this... Last reply: Hashir Usman, Jan 19, 2022, 10:28 am |
|
Warehouse renovation: insulation required per ASHRAE 90.1-2010?NC-v4 EAp2: Minimum Energy Performanceposted by Alessandro Zuanon on Jan 28, 2021, 5:11 amanswered this same question multiple times on these forums. Specifically it says- 5.4.1 Insulation. Where insulation is required in Section 5.5 or 5.6, it shall comply with the requirements found in Sections... Last reply: Alessandro Zuanon, Jan 28, 2021, 10:35 am |