SkylightsNC-v4.1 EQc2: Low-emitting materialsposted by Neil Rosen on Sep 4, 2020, 12:18 pm
How does one go about documenting a skylight under the Low-Emitting Materials credit in V4.1? The glass portion, the overwelming majority of the... Last reply: L W, Jan 27, 2021, 11:32 am |
|
Green power and carbon offsets- 100% Electric BuildingCS-v4 EAc7: Green power and carbon offsetsposted by Wayne Mc Fall on Sep 13, 2020, 5:39 pm
Hi All, We are working on a 100% electric building pursuing LEEDv4 BD+C: Core and Shell. The client would like to explore the option of pursuing the... Last reply: Wayne Mc Fall, Sep 14, 2020, 11:53 am |
|
CWM Plan for Only Commingled DiversionNC-v4 MRp2: Construction and demolition waste management planningposted by Michelle Rosenberger on Sep 18, 2020, 5:48 pm
My project has decided not to pursue any source separation and will only use... Last reply: Michelle Rosenberger, Oct 30, 2023, 12:34 pm |
|
Point of extraction, manufacturing, and purchase for steel?NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by emily reese moody on Sep 24, 2020, 9:32 pm
Need a sanity check here... For identifying the steel extraction location, my colleagues and I swear that it was acceptable to use the mill as the point of extraction, manufacturing, and... Last reply: Shannon Oletic, Sep 25, 2020, 1:52 pm |
|
LEED NC & Major Renovation, excluding parking garageNC-v4 MPR2: Must use reasonable LEED boundariesposted by on Sep 25, 2020, 9:40 am
Hi, I have a question regarding an existing building that will undergo a major renovation. There is a separate parking garage that is not connected to the building however it was included... Last reply: Ralph Bicknese, Sep 29, 2020, 11:00 am |
|
Entryway SystemNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Summer Gorder on Oct 9, 2020, 9:21 pm
Does the 10'-0" entrway requirement only apply to the main entry or all entries to the building? Last reply: Maria Porter, Jun 4, 2021, 3:51 am |
|
UL Certified EPDs.NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Susan Di Giulio on Oct 12, 2020, 5:41 pm
Hi, 'Way back in 2013, there was an announcement of a joint... Last reply: Bipin Karki, Jan 22, 2021, 8:17 am |
|
Curtain wall systemNC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Oct 15, 2020, 9:48 am
Hi all, We are working on a new building with a curtain wall system and are wondering how we should be modeling the Baseline building fenestration. I presume we should we be going with the... Last reply: Nikos Tsitsikas, Oct 16, 2020, 5:17 am |
|
Garage ventilationNC-v4.1 EAp2: Minimum Energy Performanceposted by Ying Lindsey on Oct 15, 2020, 6:11 pmcontrol? I found a similar discussion here LINK https://leeduser.buildinggreen.com/forum/taking-credit-dcv-car-parks. This clarified that if the law requests the DCV control, no credit can be claimed from... Last reply: Tyler Thumma, Nov 5, 2020, 3:34 pm |
|
LEED ND Plan on Indoor Water Use ReductionND-Plan-v4 GIBp3: Indoor water use reductionposted by Michael Wahjudi on Oct 30, 2020, 4:27 am
Hi all, Under GIB Prerequisite: Indoor Water Use Reduction, as the concept plan might be limited on details on fixtures and fittings. Are we able to use letter of undertaking on maximum... Last reply: Eliot Allen, Jun 22, 2024, 5:03 pm |