Log in
Forum
Topic

PROJECTS WITHOUT AVAILABLE RECYCLING INFRASTRUCTURE

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Giuseppina Amorusi on Aug 10, 2018, 8:30 am

Hallo

I have a project  in a site where there are  no available recycling infrastructure.  

In any case I would like to provide accessible recycling area to  encourage waste...

Last reply: Alana Cristante, Mar 11, 2019, 10:15 am

Baseline Building

Hospitality-NC-v4 EAp2: Minimum Energy Performance
posted by VICTOR MORENO on Aug 13, 2018, 4:57 am

what ASHRAE Standard we use to create baseline building of one floor bungalow (hotel)?

Last reply: Ricardo Sá, Feb 6, 2020, 11:06 am

Permanently Installed Definition

CI-v4 MRc3: Building product disclosure and optimization - environmental product declarations
posted by Bonny Gray on Aug 13, 2018, 12:06 pm

Building product disclosure and optimization - environmental product declarations

Option 1. environmental products, 
Use at least 20 different permanently installed products sourced...

Last reply: Landis Wilson, Feb 21, 2020, 7:07 pm

Claiming Energy Savings in Tenant Areas

CS-v4 EAp2: Minimum Energy Performance
posted by Michael Hammond on Aug 15, 2018, 11:20 am

Good afternoon,

I’m part of a team working on a LEED v4 Core & Shell project. While working through the project, a tenant has now come on board and they have fitted out the tenant...

Last reply: Michael Hammond, Aug 17, 2018, 3:05 am

LEED costs

LEED Rating System Selection
posted by Barry Giles on Aug 16, 2018, 1:20 pm

With USGBC just announcing the jump in membership fees, does anyone know if there  will be corresponding alteration in the discount level...

Last reply: Dave Hubka, Aug 16, 2018, 3:38 pm

EAp2 for a Lab Building

NC-2009 EAp2: Minimum Energy Performance
posted by Roxanne Button on Aug 19, 2018, 9:28 pm

I have been brought into this project as the LEED consultant at a very late stage (about to start construction).  

This is the third phase of a large college science facility.  This is an...

Last reply: Roxanne Button, Aug 21, 2018, 9:52 am

v4, IDC, LEED Interpretation ID# 10419, 2013 Title 24 Part 6 California Energy Code- Existing envelope?

CI-v4 EAp2: Minimum Energy Performance
posted by Kevin Gilleran on Aug 21, 2018, 6:35 pm

Hi,

Option 1 energy simulation - I am in review of the...

Last reply: Kevin Gilleran, Aug 22, 2018, 1:29 pm

Water Restoration Certificates Pilot Credit

NC-v4 INc1: Innovation
posted by Lissa Spitz on Sep 13, 2018, 10:50 am

Hi, can anyone confirm if the volume is supposed to be for the baseline or design annual water use?

thanks!

Last reply: Aliesa Adelman, Jul 26, 2022, 12:06 pm

Electrochromic Glazing for LEED v4 EQ 8.1 Quality Views Credit

NC-v4 EQc8: Quality Views
posted by Shalini Gali on Sep 14, 2018, 1:24 pm

LEED v4 states that “View glazing in the contributing area must provide a clear image of the exterior, not obstructed by frits, fibers, patterned glazing, or added tints that distort color...

Last reply: Nadia Bini, Oct 5, 2023, 10:04 am

Cross-contamination prevention: dedicated exhaust system still required?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Luis Andrade on Sep 21, 2018, 4:49 am

Hi,

In order to achieve EQc1 - option 1 do I still need to intall dedicated exhaust systems to all spaces where are hazardous gases are present? In LEED v2009  (IEQc5) this was mandatory....

Last reply: Stephanie Graham, Jan 9, 2019, 12:28 pm