Topic | Recent |
---|---|
PROJECTS WITHOUT AVAILABLE RECYCLING INFRASTRUCTURENC-v4 MRp1: Storage and Collection of Recyclablesposted by Giuseppina Amorusi on Aug 10, 2018, 8:30 am
Hallo I have a project in a site where there are no available recycling infrastructure. In any case I would like to provide accessible recycling area to encourage waste... Last reply: Alana Cristante, Mar 11, 2019, 10:15 am |
|
Baseline BuildingHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by VICTOR MORENO on Aug 13, 2018, 4:57 am
what ASHRAE Standard we use to create baseline building of one floor bungalow (hotel)? Last reply: Ricardo Sá, Feb 6, 2020, 11:06 am |
|
Permanently Installed DefinitionCI-v4 MRc3: Building product disclosure and optimization - environmental product declarationsposted by Bonny Gray on Aug 13, 2018, 12:06 pm
Building product disclosure and optimization - environmental product declarations Option 1. environmental products, Last reply: Landis Wilson, Feb 21, 2020, 7:07 pm |
|
Claiming Energy Savings in Tenant AreasCS-v4 EAp2: Minimum Energy Performanceposted by Michael Hammond on Aug 15, 2018, 11:20 am
Good afternoon, I’m part of a team working on a LEED v4 Core & Shell project. While working through the project, a tenant has now come on board and they have fitted out the tenant... Last reply: Michael Hammond, Aug 17, 2018, 3:05 am |
|
LEED costsLEED Rating System Selectionposted by Barry Giles on Aug 16, 2018, 1:20 pm
With USGBC just announcing the jump in membership fees, does anyone know if there will be corresponding alteration in the discount level... Last reply: Dave Hubka, Aug 16, 2018, 3:38 pm |
|
EAp2 for a Lab BuildingNC-2009 EAp2: Minimum Energy Performanceposted by Roxanne Button on Aug 19, 2018, 9:28 pm
I have been brought into this project as the LEED consultant at a very late stage (about to start construction). This is the third phase of a large college science facility. This is an... Last reply: Roxanne Button, Aug 21, 2018, 9:52 am |
|
v4, IDC, LEED Interpretation ID# 10419, 2013 Title 24 Part 6 California Energy Code- Existing envelope?CI-v4 EAp2: Minimum Energy Performanceposted by Kevin Gilleran on Aug 21, 2018, 6:35 pm
Hi, Option 1 energy simulation - I am in review of the... Last reply: Kevin Gilleran, Aug 22, 2018, 1:29 pm |
|
Water Restoration Certificates Pilot CreditNC-v4 INc1: Innovationposted by Lissa Spitz on Sep 13, 2018, 10:50 am
Hi, can anyone confirm if the volume is supposed to be for the baseline or design annual water use? thanks! Last reply: Aliesa Adelman, Jul 26, 2022, 12:06 pm |
|
Electrochromic Glazing for LEED v4 EQ 8.1 Quality Views CreditNC-v4 EQc8: Quality Viewsposted by Shalini Gali on Sep 14, 2018, 1:24 pm
LEED v4 states that “View glazing in the contributing area must provide a clear image of the exterior, not obstructed by frits, fibers, patterned glazing, or added tints that distort color... Last reply: Nadia Bini, Oct 5, 2023, 10:04 am |
|
Cross-contamination prevention: dedicated exhaust system still required?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Luis Andrade on Sep 21, 2018, 4:49 am
Hi, In order to achieve EQc1 - option 1 do I still need to intall dedicated exhaust systems to all spaces where are hazardous gases are present? In LEED v2009 (IEQc5) this was mandatory.... Last reply: Stephanie Graham, Jan 9, 2019, 12:28 pm |