Log in
Forum
Topic

2 buildings on one site, one equipment, etc

General forums
posted by Barry Giles on Jul 7, 2011, 4:15 pm

A very interesting question and to answer it will take a lot of space.
1. Why are you only doing one?
2. Are these existing buildings or half in construction?
1. Are the two...

Last reply: Barry Giles, Jul 8, 2011, 11:36 pm

Multiple Shift FTEs

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Ed Okon on Dec 23, 2010, 8:44 am

I currently work for a manufacturing plant and am curious as to how I should approach the calculations for this credit. We operate on multiple shifts so, do I calculate the baseline and "...

Last reply: David Posada, Jul 8, 2011, 5:03 pm

Reference building- garage

CS-2009 EAc1: Optimize Energy Performance
posted by Adam Targowski on Jul 8, 2011, 8:24 am

In the building for which I'm preparing energy simulation, there's an underground garage which is heated only by used recirculated air from offices above. My question is if I should include it in...

Last reply: Marcus Sheffer, Jul 8, 2011, 10:52 am

ASHRAE compliance with naturally ventilated building

NC-2009 EAc1: Optimize Energy Performance
posted by Jean Marais on Jul 8, 2011, 9:51 am

As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally...

Does Automation promote integrated design?

General forums
posted by Nadav Malin on Jul 8, 2011, 7:42 am

On the page about Pilot Credit 5 John Albrecht proposed that Automation enabled project management tools can help make the design process more integrated....

pilot credits- we need your help!

Pilot-Credits PC5: Preliminary Integrative Project Planning & Design
posted by brendan owens on Aug 20, 2010, 10:46 am

of a dedicated forum page on LEED Automation. Adrianna Schneider has already started such a page with a question she posted. Shall we take this conversation over there? Log in or register to post comments ...

Last reply: Nadav Malin, Jul 8, 2011, 7:36 am

Question Regarding Requirements

Schools-2009 IEQc8.2: Daylight and views - views
posted by John Drigot on Sep 28, 2009, 11:49 am

I am trying to understand the requirements of this credit as it relates to the...

Last reply: Sonrisa Lucero, Jul 7, 2011, 7:42 pm

Re: Addition to LEED Certified Building

General forums
posted by David Posada on Jul 7, 2011, 4:38 pm

I've not heard of re-submitting an already certified building other than pursuing...

Re-application of Toxic Pesticides

EBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest management
posted by Andy Rhoades on Jul 27, 2010, 8:46 pm

We have a project that needs to use toxic pesticides to control the rodents. We have taken the LEED compliant procedure and notified the tenants 72 hours prior to the pesticide application. The...

Last reply: Stephanie Graham, Jul 7, 2011, 4:23 pm

LEED LCA Calculator

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Kelly Roberts on Jun 22, 2011, 5:30 pm

The link to the LEED LCA Credit Calculator does not appear to be working anymore. Does anyone know why this is?
The site is:
...

Last reply: Susan Walter, Jul 7, 2011, 3:04 pm