Topic | Recent |
---|---|
Basic ServicesHealthcare-v2009 SSc2: Development Density and Community Connectivityposted by Craig Pryde on Aug 25, 2014, 3:41 pm
I am working on meeting the requirements of this credit and would like to know if a trade school/ training center qualifies under the "school" category?. I cannot find any further description of... Last reply: riiupw epics, Jan 22, 2021, 8:16 am |
|
Good news from GBCI!Healthcare-v2009 MRc3: Sustainably sourced materials and productsposted by Mara Baum on Oct 3, 2014, 2:57 pm
I just got the word that... Last reply: Mara Baum, Jan 20, 2016, 12:44 pm |
|
revising LEED boundary on old project (LEED NCv2.2)Healthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Courtney Royal on Jan 2, 2015, 2:22 pmmay be problematic if you cannot get documentation for the entire site. Finally, this post is in the NC-2009 MPR3 forum, but LEEDv3 MPRs do not apply to v2.2 projects. NCv2.2 boundary rules were a bit... Last reply: Jon Clifford, Jan 8, 2015, 7:30 am |
|
Sustainable furniture cost > 100% total furniture costHealthcare-v2009 MRc5: Furniture and medical furnishingsposted by Catherine Adams on Feb 26, 2015, 11:21 am
According to the Healthcare reference guide under MRc5 Section 8 Examples: "furniture that meets the criteria for more than one option can be counted twice". A $100 item where 95% meets Option 1... Last reply: Mara Baum, Feb 27, 2015, 12:09 pm |
|
2 buildings but cannot function independently without the otherNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Miriam Ramirez Baumgarten on Sep 7, 2015, 6:37 pm
Hi, Last reply: Miriam Ramirez Baumgarten, Aug 8, 2016, 2:28 pm |
|
Resort Hotel and CondoNC-2009 MPR2: Must be a complete, permanent building or spaceposted by John Zehren on Nov 30, 2015, 6:33 pm
I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date. Floors 1-5 are under... Last reply: Christopher Schaffner, Dec 17, 2015, 7:01 pm |
|
Water closet & Blow-out fixtureHealthcare-v2009 WEp1: Water Use Reductionposted by Ivy Lin on Jan 23, 2017, 11:25 pm
In the template of WEp1 ,what the definition between the words" water closet" and "blow-out fixture" according to the table WEp1-3 (flush fixture data)? Last reply: Mara Baum, Feb 3, 2017, 1:00 pm |
|
What is an intersection?ND-v2009 SLLc1: Preferred locationsposted by Timothy Nabholz on Feb 4, 2013, 10:08 am
I am currently using a radii around one of our potential sites and am trying to calculate how many intersections are within that radius. The only problem is I am not sure what is considered an... Last reply: Eliot Allen, Feb 5, 2013, 11:35 am |
|
Recycling Design Guidelines for large projectsND-v2009 GIBc16: Solid waste management infrastructureposted by Lauren Sparandara on Apr 15, 2013, 2:47 pm
I am working on a project with many large buildings (man greater than 600,00 sf). I wanted to advise the client on how much area they should set aside for recycling. Using the table in the... Last reply: Eliot Allen, Apr 16, 2013, 10:57 am |
|
Previously developed?ND-v2009 SLLc1: Preferred locationsposted by Scott Preston on Aug 19, 2013, 2:52 pm
Our project is an... Last reply: Michael DeVuono, Dec 19, 2013, 8:22 am |