LEED v4 formsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Szymon Zwoniarkiewicz on Feb 15, 2017, 5:57 am
My problem is that in current project under LEED v4 I cannot find the forms in LEED Online. The project is registered and invoice is payer but there are no active forms there as it used to be in... Last reply: Deborah Lucking, Feb 15, 2017, 11:49 am |
|
Rooms to be considered for IEQ C5NC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by VEL MUTHU on Feb 20, 2017, 10:38 am
I am working on a project which attempts for IEQ C5. When listing the list of rooms to be considered for credit compliance as per LEED V3 (i.e. garages, housekeeping and laundry areas,... Last reply: Jean Marais, Feb 21, 2017, 9:00 am |
|
Bicycle NetworkNC-v4 LTc6: Bicycle facilitiesposted by Agustina Galli on Feb 20, 2017, 3:31 pm
Hello! I have a project in a small town where most of the people move arround in bikes but there are no bicycle networks, it´s just not necesary because of the small transit and... Last reply: Sarah Michelman, Mar 28, 2017, 2:17 pm |
|
Change to Furniture Evaluation CriteriaNC-v4 EQc2: Low-emitting materialsposted by Ian Thompson on Feb 23, 2017, 6:08 am
There was a rating system correction at the end of January http://www.usgbc.org/node/10611490 which seems to reduce the value of a Furniture... Last reply: Trista Brown, Nov 28, 2017, 3:18 pm |
|
Light Reflectance for Interior Glazed WallsNC-v4 EQc6: Interior lightingposted by Gray Bender on Feb 28, 2017, 8:55 am
Hi All, We're working on a project that has a number of internal floor-to-ceiling glass walls, some of which are transparent and others are semi-transparent. I'm wondering how those are... Last reply: JLL Sustainability Consulting, Sep 23, 2020, 10:15 am |
|
Filling the Minimum Performance Calculator for 100% OAEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Rasita Masalskyte on Feb 28, 2017, 11:43 am
SIngle 100% outdoor air... Last reply: Rasita Masalskyte, Mar 3, 2017, 5:27 am |
|
Colored surface hardener in Powder form (Cement based)NC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Mario S. on Mar 2, 2017, 9:01 am
We are working on a project that will install terrazzo and polished concrete flooring. These are both mineral based and are exempt from testing requirements for flooring systems. Last reply: Mario S., Mar 2, 2017, 10:25 am |
|
Exhaust rate in retail units.NC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by VEL MUTHU on Mar 3, 2017, 1:18 pm
I am currently working on a project which has 6 retail outlets in a very big building for the users in that building. Do i need to maintain 0.5 cfm/sqft requirement and the pressure requirements... Last reply: VEL MUTHU, Mar 6, 2017, 7:08 am |
|
Air testing related to partial renovation per floorNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Julie Barth on Mar 9, 2017, 6:21 pm
I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated. The building has 8 floors with north and south... Last reply: Dale Walsh, Mar 10, 2017, 7:44 pm |
|
Using different energy rates between CHP Proposed and BaselineNC-v4 EAp2: Minimum Energy Performanceposted by Mark Benson on Mar 10, 2017, 12:39 pm
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models. But what happens when the Proposed model... Last reply: Raphael Sperry, Aug 29, 2017, 4:38 pm |