Topic | Recent |
---|---|
European project- example of signageNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Maria Perzon on Dec 21, 2016, 9:47 am
Our project would like to get a credit for prefered parking. As I can see in the European Alternative Compliance Path (ACP) all Euro 6 cars fulfill the demands. It is however unusual and not so... Last reply: Maria Porter, Feb 9, 2018, 5:28 am |
|
Low E Vehicle parking calculationNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Dina Cheyette on Dec 22, 2016, 3:52 pmI referenced is only visible to LEEDuser members. This forum is a free resource of the LEEDuser website (and feeds to usgbc.org). This forum is run by volunteers. Basically the FAQ says that you must include all... Last reply: Allison Smith, Jan 10, 2017, 2:21 pm |
|
Garbage Truck Maintenance GarageNC-v4 SSc5: Heat Island Reductionposted by Edgar Arevalo on Jan 17, 2017, 11:16 am
Even though the vehicles parked inside the garage are garbage trucks and not vehicles used by... Last reply: Summer Minchew, May 5, 2017, 7:52 am |
|
SS Environmental Site Assessment (Prerequisite)- Phase I ESAHealthcare-v4 SSp2: Environmental Site Assessmentposted by Jeff Frederick on Jan 17, 2017, 2:39 pm
The LEED V4 Reference Guide states that "If a Phase I ESA is more than one year old, a new assessment is required". At what moment is the duration since the previous ESA measured? Is it... Last reply: Margaret Montgomery, Oct 27, 2021, 1:30 pm |
|
Product type classificationNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Raquel Ortiz on Jan 23, 2017, 5:23 pm
Hello, Last reply: Susan Walter, Jul 25, 2017, 4:06 pm |
|
Water closet & Blow-out fixtureHealthcare-v2009 WEp1: Water Use Reductionposted by Ivy Lin on Jan 23, 2017, 11:25 pm
In the template of WEp1 ,what the definition between the words" water closet" and "blow-out fixture" according to the table WEp1-3 (flush fixture data)? Last reply: Mara Baum, Feb 3, 2017, 1:00 pm |
|
FloorScore credit on wall applicationsNC-v4 EQc2: Low-emitting materialsposted by Rick Farrell on Jan 31, 2017, 7:42 pm
If a FloorScore certified product, specifically a pre-finished engineered... Last reply: Michelle Halle Stern, Feb 1, 2017, 1:41 pm |
|
Confusion over adjacency and shared systemsNC-v4 MPR2: Must use reasonable LEED boundariesposted by GBD Architects on Feb 3, 2017, 1:35 pmlikely include the walkway in the new building. Look at EAp2 and the forum there for guidance on the energy credit. It's been done before, I guarantee it! Log in or register to post comments Tristan... Last reply: Tristan Roberts, Feb 3, 2017, 11:07 pm |
|
Data Center CxANC-v4 EAp1: Fundamental commissioning and verificationposted by Peter Dishno on Feb 10, 2017, 3:57 pm
The LEED V4 book has the comment: "DATA CENTERS ONLY Last reply: Scott Bowman, Feb 19, 2017, 5:24 pm |
|
Optimization 27- antimicrobial activity for surfacesWELL v1 Building Standard Tip Sheetposted by Dionisio Franca on Feb 14, 2017, 4:48 am
First question: The optimization (read credit) requires: countertops, water fixtures, doorknobs, lightswitches to meet EPA testing requirements for antimicrobial activity. Is "EPA antimicrobial... Last reply: Joyce Kelly, Jul 14, 2020, 10:46 am |