EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSASchools-2009 EAp2: Minimum Energy Performanceposted by VEL MUTHU on Sep 15, 2015, 11:58 am
Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1. I found that, it is a requirement to establish energy rating goal using EPA's target... Last reply: VEL MUTHU, Sep 19, 2015, 5:00 am |
|
LEED v4 for HomesND-v4 GIBc2: Optimize building energy performanceposted by Ian Scott on Sep 18, 2015, 2:20 pm
Our project is mixed with some building 4 stories plus and some 3 stories and less. I have two questions. 1. For the 3 stories and less buildings (Group 2) is there a pathway to achieve 1... Last reply: Ian Scott, Sep 22, 2015, 12:24 pm |
|
Hospital Renovation- Occupancy Default QuestionNC-2009 PIf3: Occupant and Usage Dataposted by Sara Zoumbaris on Sep 20, 2015, 11:23 am
Hi All - We are working on a major renovation of 1 floor that have patient rooms within a hospital. Although this project is BD+C, I am interested on how to calculate the occupancy as if it were... Last reply: Sara Zoumbaris, Sep 24, 2015, 8:27 am |
|
Dehumidification + reheatNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Sep 22, 2015, 4:03 am
In the designed... Last reply: Jean Marais, Sep 23, 2015, 5:52 am |
|
Inclusion of selective Div. 12 products?NC-2009 MRc4: Recycled Contentposted by Michelle Robinson Schwarting on Sep 23, 2015, 1:31 pmthis is an NCv3 forum, I will focus on V3. Similarly, LI#3005, which addressed MEP work as well as furniture, does not apply to NCv3. When this and several other rulings came down, NCv2 requirements were still... Last reply: Anya Fiechtl, Jul 1, 2020, 5:06 pm |
|
Air Testing before Occupancy for phased move-inNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Karl Heitman on Sep 23, 2015, 5:00 pm
How does LEED interpret occupancy date? Our project is consisted of warehouse, manufacturing and corporate office and they are moving in by phase for each space type with Temporary Certificate... Last reply: Ashley Hu, Jun 21, 2018, 4:32 pm |
|
Building footprintNC-2009 PIf2: Project Summary Detailsposted by Heather Holdridge on Sep 29, 2015, 11:52 am
Should the footprint of the project building include covered walkways, porches, etc? Last reply: Eric Bautista, Aug 4, 2016, 3:25 am |
|
Dwelling Units/Residential definition for ventilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Larry Jones on Sep 30, 2015, 11:27 am
Can anyone provide me with a definition or point me towards how LEED v4 defines a dwelling unit? I have a dormitory project and am trying to interpret the Resi Only requirements for v4. As an... Last reply: Takayuki Hirota, Jan 23, 2019, 8:06 pm |
|
LEED Pakistan-- Availability and detailsLEED Rating System Selectionposted by Hassaan Sipra on Oct 11, 2015, 9:35 pm
I am interested in finding out if LEED has guidelines for Pakistan, specifically Islamabad, as I am doing a project for one of my master's courses in Green Buildings in that area. The project... Last reply: shamim uddin, Nov 27, 2018, 1:03 pm |
|
4 point mandatory minimumNC-2009 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Oct 13, 2015, 10:01 am
Recently an addenda was published to refer that "for projects that register after XX/XX/XX and are subject to the four point mandatory minimum, demonstrate an 18% improvement in the proposed... Last reply: Marcus Sheffer, Dec 23, 2015, 1:47 pm |