Topic | Recent |
---|---|
Eligibility for case 1 option 2NC-2009 SSc6.1: Stormwater design - quantity controlposted by tomaz kipnis on Jul 30, 2014, 9:59 am
Hi, The requirements for Option 2 (case 1) of this credit refer to the protection of receiving stream channels. If my project receiving body is not a stream channel, but a... Last reply: emily reese moody, Sep 11, 2018, 4:45 pm |
|
EBOM IEQp1-A1 Statement "Would need over 100% OA Intake"EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by James Doyle on Jul 31, 2014, 8:50 am
Our EBOM 2009... Last reply: Gustavo De las Heras Izquierdo, Dec 15, 2016, 5:53 pm |
|
No parkingCS-v4 LTc7: Reduced parking footprintposted by Mike D on Aug 4, 2014, 11:32 am
Can this credit be achieved if there are no parking spaces provided? Last reply: Tristan Roberts, Sep 13, 2017, 1:12 pm |
|
How long do you have to do surveys?NC-2009 IEQc7.2: Thermal comfort - verificationposted by Parker williams on Aug 6, 2014, 6:08 pmSusan Walter HDR LEEDuser Expert 1296 thumbs up August 7, 2014- 3:12 pm You have to do one between 6 and 18 months after occupancy per the credit language. If projects are doing Enhanced Commissioning, most teams align this survey with that credit work as the survey can inform the commissioning. Log in or register to post comments Kathryn West LEED AP BD+C, O+M, Green Globes Professional JLL LEEDuser Basic Member 154 thumbs up August 7, 2014- 3:15 pm The form now says you have to confirm there is a "permanent" monitoring system. Based on feedback in this forum and from... Last reply: Kathryn West, May 20, 2015, 5:45 pm |
|
Residential Switched ReceptaclesNC-2009 IEQc6.1: Controllability of systems - lightingposted by Alexis Thompson on Aug 6, 2014, 7:14 pm
To satisfy credit requirements should we provide the corresponding light fixtures for switched receptacles in residential units in a multi-family high-rise project?... Last reply: Brightworks Sustainability, Nov 15, 2016, 8:17 pm |
|
Energy-Star equivalent productsCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by R G on Aug 11, 2014, 2:40 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up August 11, 2014- 2:47 pm I think that there has been a number of posts in the forum related to demonstrating equivalency between Energy Star and other standards, you should attempt to do so. Focus on energy use. Log in or register to post comments Suzanne Painter-Supplee, LEED AP+ID&C Principal SEESolutions LLC LEEDuser Basic Member 126 thumbs up August 11, 2014- 6:39 pm You didn't say which appliance categorty, but....IF it is commercial kitchen equipment, most manufacturers will have 50 cycle spec sheets... Last reply: Geraldine Assmus, Aug 21, 2015, 10:25 am |
|
Data center modelingData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Aug 19, 2014, 8:44 am
Greetings, Last reply: Vassil Vassilev, Aug 19, 2014, 10:37 am |
|
Glazing ratioNC-2009 EAp2: Minimum Energy Performanceposted by CT G on Aug 20, 2014, 4:59 pm
We are working with a building that has 9 floors, the first 6 floors are for parking, unconditioned naturally ventilated with no glass on the envelope, and the last 3 are conditioned office... Last reply: Marcus Sheffer, Aug 21, 2014, 10:03 am |
|
Contract through Design Team- conflicting informationNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Rory Cousino on Aug 22, 2014, 9:51 am
I am going to ask a question that is probably been answered before - but I cannot find the simple answer. Can the CXA be contracted through / to the Design Team? It appears from the FAQs... Last reply: Scott Bowman, Oct 4, 2016, 5:16 pm |
|
Basic ServicesHealthcare-v2009 SSc2: Development Density and Community Connectivityposted by Craig Pryde on Aug 25, 2014, 3:41 pm
I am working on meeting the requirements of this credit and would like to know if a trade school/ training center qualifies under the "school" category?. I cannot find any further description of... Last reply: riiupw epics, Jan 22, 2021, 8:16 am |