Forum quick links
Renewable Energy Contract question...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
Our client is trying to sign a 2 year contract for renewable energy, and the company he is engaged with only offers 1 year.
Residential building above
Retail-CI-v4 EQp2:Environmental Tobacco Smoke Controlposted by Francisco Sanchez Arroyo on
I am thinking of upgrading a v2009 project to V4 but I am concerned if I will meet the requirements of this prerrequisite.
Please Consider Universal Accessibility
Pilot-Credits EQpc78:Design for active occupantsposted by Jonathan Ramsey on
Requirement 5 states "Locate a main staircase to be visible before an occupant visually encounters any motorized vertical circulation (elevator/escalator).
Can Ice rink and Ski centre be excluded
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Leanne Niu on
Recently, i am working for a complex commercial project including a ice rink and a ski centre. These two spaces are acturally very special, whether we can exclude them when we consider thermal comf
Non-smoking campus - are exterior signs required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Renee Shirey on
My project is on a college campus that is non-smoking on the entire campus, there are no areas with permitted smoking. The streets themselves are university property, not public streets.
Sensor based lavatory faucet compliance
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Faisal on
Hi, How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is EAF-200-P-
PFP fan allowance in Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a VAV with PFP system for basecase, and I need to know how to count for the zone fan power in table 1.4, knowing that I did enter each AHU's fan power from the Energy model to table 1.4, the
Can FEV/LEV Spaces In Existing Parking Areas Count?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Gaidis on
Hi all - I'm working on a v3 NC major renovation project.
Who can be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Allan Vásquez on
How do I know which projects are a similar managerial and technical complexity than the one I am working on?