Topic | Recent |
---|---|
Exterior lighting powerNC-2009 EAp2: Minimum Energy Performanceposted by VICTOR MORENO on Oct 7, 2014, 11:25 am
Hello. One review comments that i have received about E&Ap2 prerequisite is: 2. No exterior lighting power has been modeled for the Baseline or Proposed Case. Confirm that no... Last reply: Marcus Sheffer, Oct 9, 2014, 7:37 pm |
|
Reinforcement Steel in concreteNC-2009 MRc4: Recycled Contentposted by Lise Dannesboe on Oct 8, 2014, 3:26 am
Hi! How is reinforcement steel calculated in an... Last reply: Lise Dannesboe, Oct 9, 2014, 10:36 am |
|
Baseline envelope- Existing Buildings (Retrofit)NC-2009 EAp2: Minimum Energy Performanceposted by João Costa on Oct 9, 2014, 10:11 am
Hello, 1) According to Table 3.1 from Appendix G, thermal loads due... Last reply: Marcus Sheffer, Jul 16, 2019, 4:53 pm |
|
One or two separate buildingsNC-2009 PIf1: Minimum Program Requirementsposted by Felipe Holguin on Oct 9, 2014, 11:56 am
I have a project with two buildings that are attached physically by two underground levels with services as parking spaces, bicycle racks, showers and bathrooms and MEP systems shared for both... Last reply: Brian Salazar, Oct 14, 2014, 9:08 pm |
|
External Lightning ExceptionsNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 14, 2014, 6:30 am
Hi everyone, It is necessary to prove the power... Last reply: Marina Andrade, Oct 14, 2014, 8:54 am |
|
100% OA multiple zones systemNC-2009 IEQp1: Minimum indoor air quality performanceposted by Charline SEYTIER on Oct 16, 2014, 4:43 am
Hi Everyone, We are currently working on a project including an 100% OA... Last reply: Andrew Mitchell, P.E., Oct 28, 2014, 8:41 am |
|
Hot desks as regularly occupied space?NC-2009 IEQc8.1: Daylight and views - daylightposted by Paul Rogers on Oct 20, 2014, 6:07 am
Should an area designated for hot desking be included as a regularly occupied area? No single user will spend more than one hour per day at these workstations. Last reply: Jill Perry, PE, Oct 20, 2014, 6:35 pm |
|
Ventilation EffectivenessNC-2009 IEQp1: Minimum indoor air quality performanceposted by Dustin Balton on Oct 20, 2014, 11:43 am
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air. They are over budget and the contractor is proposing ducting... Last reply: Dustin Balton, Oct 20, 2014, 1:21 pm |
|
Selection of HVAC Baseline SystemNC-2009 EAp2: Minimum Energy Performanceposted by Praveenbabu Rajkumar on Oct 23, 2014, 6:26 am
Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No. of Floors: 7 - including terrace floor (B+G+4+... Last reply: Marcus Sheffer, Nov 2, 2014, 6:29 pm |
|
IDF curvesNC-2009 SSc6.1: Stormwater design - quantity controlposted by MKK LEED on Oct 23, 2014, 12:19 pm
Hi, Last reply: Gustavo De las Heras Izquierdo, Jul 22, 2015, 2:55 pm |