Asphalt Milling- Will this qualify for MRc3 & MRc2?NC-2009 MRc3: Materials Reuseposted by Joel Simonyak on Jul 16, 2013, 5:24 pm
As part of our project the existing asphalt parking lot will be milled and the material will be reused in the new asphalt lot. The asphalt plant happens to be just across the... Last reply: Heather DeGrella, Mar 12, 2014, 12:25 pm |
|
RP for Credits with multiple thresholdsNC-2009 RPc1: Regional Priorityposted by Deborah Lucking on Jul 16, 2013, 6:05 pm
Can a project achieve the Regional Priority point without hitting the higher threshold of a credit? E.g., if the project's RP includes WEc1, will we achieve the RP point if we just reach 50%... Last reply: Kathryn West, Mar 24, 2014, 1:35 pm |
|
Calculating Total Irrigated Area with existing conditionsNC-2009 WEc1: Water Efficient Landscapingposted by Joel Simonyak on Jul 17, 2013, 11:17 am
We have a large site in an industrial park. We plan to include a 24 Acre parcel in our project site boundary that is owned by our client and part of this area will contain the water detention... Last reply: Lewis Hewton, Jul 17, 2013, 7:39 pm |
|
Unavailable rainfall dataNC-2009 SSc6.1: Stormwater design - quantity controlposted by Magda Aghababyan on Jul 19, 2013, 4:25 am
Hello, We have a project in Sri Lanka where we try to attempt this credit via percentile rainfall event option. However we find difficulty of getting continuous 30 year rainfall data. There are... Last reply: Michael DeVuono, Jul 22, 2013, 8:35 am |
|
How do we qualify for offsite salvaged materials?EBOM-2009 MRc2: Sustainable Purchasing—Durable Goodsposted by Katherine Ann Resurreccion on Jul 24, 2013, 9:06 pm
Hello! Last reply: Katherine Ann Resurreccion, Aug 14, 2013, 10:19 pm |
|
date of occupancy on the LEED Online TemplateNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Benjie Herrera on Jul 24, 2013, 11:31 pm
Just want to inquire what is an OCCUPANCY DATE in the LEED on line Last reply: Benjie Herrera, Jul 25, 2013, 3:09 pm |
|
Exhaust Requeriments with Natural VentilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Hector Miranda on Jul 26, 2013, 12:44 am
hi all, Can you meet the prerequisite using paragraph 5.1 (Natural ventilation) from Standard 62.1-2007 for areas that require exhaust system (i.e. toilets, kitchens, etc.)? Thanks! Last reply: Julia Weatherby, Jul 30, 2013, 11:00 am |
|
21 pointsCS-2009 EAp2: Minimum Energy Performanceposted by Markievicz E on Jul 27, 2013, 4:41 pm
Hi Guys I have a pleasant dilemma. The project is new build offices in climate zone 5a. The energy model indicate savings of 39.52% from the baseline. When I calculate the costs... Last reply: Marcus Sheffer, Aug 20, 2013, 10:22 am |
|
Damper actuator for operating HVAC systemsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Katherine Ann Resurreccion on Jul 29, 2013, 3:39 am
Hi, does a damper actuator qualify as an active control? Per... Last reply: Katherine Ann Resurreccion, Sep 4, 2013, 2:03 am |
|
Can someone help the new guy? Thanks?NC-2009 IEQc7.1: Thermal comfort - designposted by C M E on Aug 1, 2013, 1:45 pm
So I recently got hired, and the first thing they have me working on is getting familiar with LEED credits and completing the forms. This may sound like a dumb question, but how do I determine... Last reply: Lindsay Austrom, Jun 1, 2015, 6:35 pm |