New credit after the preliminary combined review process
posted by Stella Stella on
Hi, Can we submit a new credit after the preliminary combined review process(design+construction)?
EA p2
NC-2009 EAp2:Minimum Energy Performanceposted by John Lee on
I haven't energy modeled yet and am reviewing someone else's work on EAp2.
Carbon Offset Program
CI-2009 EAc4:Green Powerposted by Andreas Gyr on
I am working on a project that is performing it's own carbon offsets - ensuring that each investment in a carbon offset project has additionality, permanence, verifiability, etc.
Epoxy Flooring with ZERO VOC
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Susan Morris on
I have a project with a large area of Epoxy Flooring, this epoxy contains 0% V.O.C.'s does it count as an inert material; or is testing required? Thank you
Transients vs. Retail?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Kathryn West on
is there a definition for transients versus retail? We have a dining hall and aren't sure how to classify the students who enter the building for meals.
How can I filled the LEED Online form
CS-2009 WEc3:Water Use Reductionposted by Somsak Jidmon on
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w
System 8 VAV + PFP boxes
NC-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Dear All, We are modelling a Baseline Building with System 8 “VAV + PFP boxes” using HAP by Carrier. We are wondering how to model the VAV + PFP boxes according to ASHRAE 90.1 Section 3.1.3.14.
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Dear Sirs,
We are consultants
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Dear Sirs, We are consultants for a mall seeking LEED. Most of the spaces will be tenanted.
Reviewr's Comment is requesting labor and delivery
CI-2009 MRc4:Recycled Contentposted by Sarah Thompson on
In all my 40 LEED projects I have never included labor and delivery to a material's cost total.