New credit after the preliminary combined review process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stella Stella  on 

Hi, Can we submit a new credit after the preliminary combined review process(design+construction)?

4
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Mar 12, 2015, 1:34 am

EA p2

NC-2009 EAp2:Minimum Energy Performance
posted by  John Lee  on 

I haven't energy modeled yet and am reviewing someone else's work on EAp2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 11, 2015, 6:08 pm

Carbon Offset Program

CI-2009 EAc4:Green Power
posted by  Andreas Gyr  on 

I am working on a project that is performing it's own carbon offsets - ensuring that each investment in a carbon offset project has additionality, permanence, verifiability, etc.

3
Default Avatar
Architect LEED AP
Ingenieurbüro Anke Koch GbmH
LEEDuser Basic Member
5 thumbs up
Wed Mar 11, 2015, 1:55 pm

Epoxy Flooring with ZERO VOC

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Susan Morris  on 

I have a project with a large area of Epoxy Flooring, this epoxy contains 0% V.O.C.'s does it count as an inert material; or is testing required? Thank you

4
Wed Mar 11, 2015, 12:29 am

Transients vs. Retail?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Kathryn West  on 

is there a definition for transients versus retail? We have a dining hall and aren't sure how to classify the students who enter the building for meals.

5
Tue Mar 10, 2015, 9:02 pm

How can I filled the LEED Online form

CS-2009 WEc3:Water Use Reduction
posted by  Somsak Jidmon  on 

My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Tue Mar 10, 2015, 4:16 pm

System 8 VAV + PFP boxes

NC-2009 EAp2:Minimum Energy Performance
posted by  Giuseppina Amorusi  on 

Dear All, We are modelling a Baseline Building with System 8 “VAV + PFP boxes” using HAP by Carrier. We are wondering how to model the VAV + PFP boxes according to ASHRAE 90.1 Section 3.1.3.14.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 10, 2015, 3:08 pm

Data Center Baseline systems

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Mar 10, 2015, 2:03 pm

Dear Sirs,
We are consultants

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Maya Karkour  on 

Dear Sirs, We are consultants for a mall seeking LEED. Most of the spaces will be tenanted.

2
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Mon Mar 9, 2015, 3:45 pm

Reviewr's Comment is requesting labor and delivery

CI-2009 MRc4:Recycled Content
posted by  Sarah Thompson  on 

In all my 40 LEED projects I have never included labor and delivery to a material's cost total.

7
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Mar 9, 2015, 2:57 pm