Domestic Hot Water Consumption

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear Forum, If we do not want to show any energy savings associated with hot water pumps for domestic hot water system, Section G3.1-11 states that service water loads and usage shall be the same

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Nov 30, 2015, 4:34 pm

Office tower on a shopping center "plinth"

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ricardo Sá  on 

I'm working on a project that consists of an office building tower that will be erected on top of a shopping center built 20 years ago.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Nov 30, 2015, 4:28 pm

Tenant Guidelines for CS spaces within NC

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Melanie Silver  on 

We are working on a large residential project that has two very tiny retail spaces at the base (one less than 500 sf, and the other about 1500 sf).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 30, 2015, 3:13 pm

rust oleum magnetic primer

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Anastasia Makarenko  on 

Dear all, could anyone please help me define the type of the following material - Rust oleum Magnetic primer which is used to create magnetic surface at the wall.

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Nov 30, 2015, 1:08 pm

whiteboard paint

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Craig Flandermeyer  on 

What category would whiteboard paint fall under? Plan to use IdeaPaint which has a COC of 325 g/L, don't want to calculate the VOC budget method if not necessary. Thanks!

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Nov 30, 2015, 12:42 pm

Framed assembly U-value calculated by WinISO 2D Software

NC-2009 EAp2:Minimum Energy Performance
posted by  Mayank Bhatnagar  on 

Hi, As per reviewer comment the calculation for U-value of whole window assembly (including frame) used for the Proposed case windows can be demonstrated by different method such as NFRC rating, Wi

5
Mon Nov 30, 2015, 12:01 pm

ESC gap between the excavation phase and construction phase

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Meghan Ward  on 

I am working on a 2-building campus project where an ESC plan was implemented during excavations phase (bulk earthworks) of the whole campus.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 30, 2015, 8:43 am

"open bottom planters"

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Charles Nepps  on 

I know this has come up before, but haven't been able to find a precise answer. What exactly is an open bottom planter?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Nov 29, 2015, 10:10 pm

Manually Watering instead of Temporary Irrigation?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Patrice McVeigh  on 

Hi All, For a water efficient landscape, with native plants and no requirements for irrigation except a temporary irrigation system for 12 or 18 months. Can a person within the maintenance team o

3
Fri Nov 27, 2015, 7:24 pm

Responsible person

NC-2009 SSc1:Site Selection
posted by  Lilian Seow  on 

Who should be the responsible person signing the letter template for this credit?

3
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Fri Nov 27, 2015, 7:18 pm