demolition of existing facade

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

Some years ago the facade of an existing building was demolished. The facade was completely glazed. The structure of the building (pillars, beams) was conserved.

3
Fri Feb 5, 2016, 8:18 pm

Process Energy Exceptional Calculation

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Hello, we are considering attempting the exceptional calculation method allowed in Section G2.5 for process load savings on a hospital project: the design is proposing equipment sterilization throu

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Feb 5, 2016, 8:15 pm

Pump Room, STP Room & Guard Room Within LEED Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aswin M  on 

We have a factory project to be registered under LEED New Construction.

3
Fri Feb 5, 2016, 9:41 am

Water Heater and Water Coolers

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Shuchita Gupta  on 

Hi , Are Water Heaters ( under a separate Water heater category ) and water cooler ( under others category ) under energy star website require energy star compliance , since the categories listed

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 5, 2016, 5:06 am

Fire Extinguisher & Cabinet (MRc4 & MRc5)

NC-2009 MRc4:Recycled Content
posted by  Elliot Young  on 

Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.

2
Associate
NK Architects
LEEDuser Basic Member
11 thumbs up
Fri Feb 5, 2016, 1:47 am

Guns to Rebar for Innovation Credit

NC-2009 IDc1:Innovation in Design
posted by  Rachel Manoguerra  on 

I have a project that bought and used rebar in their facility that was from a program called "Guns to Rebar". Guns were collected and melted down and sold as rebar.

3
Fri Feb 5, 2016, 12:49 am

New Option: Outdoor walking path

Pilot-Credits EQpc78:Design for active occupants
posted by  Stephanie Graham  on 

I'd like to see an option for a walking/running path on the site of at least a mile in length and/or fitness cross-training stations at intervals along the path.

3
Thu Feb 4, 2016, 3:44 pm

Entryway systems length - Why 10 Feet not 9?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ahmed Mosa  on 

Why Entryway systems are at least 10 feet not 9 or 8?

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 4, 2016, 6:06 am

Square Footage of Parking Areas

NC-2009 PIf2:Project Summary Details
posted by  Deirdre Espiritu  on 

Where are the guidelines on how to do this takeoff? Because parking is connected by vehicle circulation spaces as well is it correct to just use the area of the actual parking spaces?

2
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Tue Feb 2, 2016, 4:58 am

What exactly "parking area" means?

NC-2009 PIf2:Project Summary Details
posted by  Alicja Bieszyńska  on 

I found here two contrary oppinions regarding what area of a building's garage that should be excluded from the gross building area calculations. Is it just the parking spots or the area covered by

2
Tue Feb 2, 2016, 4:53 am